Forum quick links
Forum
Topic
Replies
Recent
Existing Irrigated Turf Area
NC-v4 WEp1:Outdoor water use reductionposted by Michelle Rosenberger on
Our project will add a building to a large existing master planned area.
3
Tue Oct 26, 2021, 6:18 pm
Daylight controls in multifamily mid-rise residential buildings
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hi,
3
Tue Oct 26, 2021, 6:00 pm
Soil stockpiling over the winter
NC-v4 SSp1:Construction activity pollution preventionposted by Scott Beckman on
We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter.
1
Tue Oct 26, 2021, 8:20 pm
Weekend trip counts for Office Location
CS-v4 LTc5:Access to quality transitposted by Andy Rhoades on
Hi there,
2
Tue Oct 26, 2021, 12:06 pm
Path 1. Divert 50% and Two Material Streams (1 point)
NC-v4 MRc5:Construction and demolition waste managementposted by Ayman Khulief on
Hello!
2
Mon Oct 25, 2021, 6:04 pm
Project pertaining to only the third floor of a building
CI-v4 EAc2:Optimize energy performanceposted by Peter Downar on
- The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
1
Fri Oct 29, 2021, 5:26 pm
Free fresh air provided to small rooms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dina El-Sady on
I am working on a project with many small buildings connected to each other , some of the very small rooms may be designed with free fresh air entering through fresh air grilles not fans , is
2
Mon Oct 25, 2021, 2:08 pm
Flooring materials applied in the lift car
CS-v4 EQc2:Low-emitting materialsposted by Ray Chan on
My project intends to apply sealant and sheet vinyl as the flooring materials in the lift car. Please advise whether the mentioned materials can be exempted from EQ2.
1
Fri Oct 29, 2021, 3:55 pm
Areas of ballasted roof counted, provided that SRI number is high enough?
NC-v4 SSc5:Heat island reductionposted by Martin Smith on
Hey friends,
1
Mon Sep 25, 2023, 11:50 pm