Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Shuttle Bus to Station Still OK?

CS-v4 LTc5:Access to quality transit
posted by  Brian Salazar  on 

Under v3, it was possible for projects outside the 1/2 mile walking distance to train transit to meet the credit via shuttle service (public or private), as long as the shuttle was within 2 miles d

3
Tue Jan 18, 2022, 7:12 pm

SSP1 scope

NC-v4 SSp1:Construction activity pollution prevention
posted by  Adam Insan  on 

Hi, 

We are working on LEED project as general contractor in middle east which is registered under LEED new construction. 

2
Tue Jan 18, 2022, 4:00 pm

Autopsy Spaces

NC-v4 EAp2:Minimum energy performance
posted by  Cory Duggin  on 

Would autopsy and associated support spaces be considered a lab space to be included on systems under G3.1.1 exception c requiring turn down at night?  I ask because these same spaces in a hos

1
Thu Feb 17, 2022, 3:12 pm

ASHRAE 62.1 2010. Section 6.2.1.2 PM2.5

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Eric Dyer  on 

Hello
We are working on the LEED project in Korea.

I have a question about ASHRAE 62.1 2010.

3
Mon Jan 17, 2022, 8:10 am

DOASs provide outdoor air to more than one tenant

CI-v4 EAc3:Advanced energy metering
posted by  CT G  on 

We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.

5
Fri Jan 14, 2022, 7:42 pm
3
Fri Jan 14, 2022, 5:36 pm

Non default use time for lavatory faucets

NC-v4 WEc2:Indoor water use reduction
posted by  Ruju Rathod  on 

 We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds. 

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 12, 2022, 5:46 pm
2
Mon Jan 10, 2022, 8:53 pm