Interior Lighting-Option F-movable partitions of fabrics

CI-v4 EQc6:Interior lighting
posted by  Rowena Rawte  on 

Hi,

We would like to understand that what should be the reflectance value for movable partitions of fabrics ?

0

Calculating Surrounding Density and Diverse Uses Combined Density Option 1

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Decorda McGee  on 

Hello, I am wondering if I am not able to get square footages of all buildings in the area from a reliable source am I able to scale a map and and use square footages that are shown

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Feb 23, 2022, 1:45 am

Net Zero Data Center

NC-v4 EAc2:Optimize energy performance
posted by  Amal Venugopal  on 

Hi All,

Greetings!..

3
Tue Feb 22, 2022, 5:32 pm

Developer-Sponsored Transit Frequency

ND-Plan-v4 NPDc8:Transportation demand management
posted by  Gabriela Mesquita  on 

ND-Plan-v4 NPDc8 - Transportation demand management 

1
Tue Feb 22, 2022, 5:15 pm
3
Tue Feb 22, 2022, 10:58 am

Sidewalks width

ND-Plan-v4 NPDp1:Walkable streets
posted by  Gabriela Mesquita  on 

Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.

0

Pass air method

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Alex Edwards  on 

Hello!
Thanks for everyone's help, I have a question about the pass air method

0

Core and Shell

CS-v4 EAp1:Fundamental commissioning and verification
posted by  Bryan Markkanen  on 

We have a Core & Shell project that is complete but doesn't have tenants.  The owner is having problems getting tenants (and their layouts/ HVAC needs) so we don't have a way to test the e

2
Energy Analyst and Sustainability Consultant
Newcomb & Boyd
LEEDuser Premium Member
2 thumbs up
Fri Feb 18, 2022, 8:07 pm

Scope

CI-v4 EAc5:Enhanced refrigerant management
posted by  Michael Smithing  on 

For a CI project with minimal new HVAC equipment is the credit scope limited to equipment within the scope of the project only, or is there a hurdle below which base building equipment must comply

6
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Thu Feb 17, 2022, 8:15 pm