Calculate U-value of exterior wall
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Regarding the U-value of the exterior wall in the proposed model, I see the LEED calculator provided a hint "Proposed construction assembly U-factor should be as-designed and consistent with A
Commercial Interior Project Information - Site Plan
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I'm working on a commercial interior project for LEED v4 rating system. Under the Project Information form, it asks for site plan. What would I provide for a project located on the
Target Finder outside the US - Project in Europe
NC-v4 EAp2:Minimum energy performanceposted by Worood Shbeikat on
Hi, Is it true that a project outside the US (located in Europe) does not necessarily have the target finder results? for LEED accreditation?
Water test location
EBOM-v4 WEc3:Cooling tower water useposted by Clive Lacey on
Water test for Cooling tower should be done on site?
Re: C&S Energy Metering Strategy in Teanat Space
CS-v4 EAc3:Advanced energy meteringposted by Yoyo Shek on
Hi LEED user,
Lighting tab - unconditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Paul Caicedo on
Hello,
I am using DesignBuilder to export the minimum energy performance calculator spreadsheet; unconditioned spaces are not filled in the Tab Lighting.
Does recessed lighting under a canopy have to be accounted for in SSc6?
CS-v4 SSc6:Light pollution reductionposted by Wen Zhang on
We are working on a project where recessed pot lights are installled under a canopy.
Prefabricated or modular structure Buildings
NC-v4 MPR1:Must be in a permanent location on existing landposted by VISHAL JAIN on
Hello,
Would like to know more details on how "Prefabricated or modular structure Buildings" can be certified under LEED.
Innovation - PILOT - ergonomics approach for computer users
NC-v4 INc1:Innovationposted by Anina Mbilinyi on
I registered EQpc44 on March 4, 2021 with V4.0 project. The documents are complete and went to LEED Online to finalize documentation and the pilot credit was gone from the form.