Post a question or comment
Credit Filters
Verified Construction & Demolition Recycling Rates
Filter by location
Forum
Topic
Replies
Recent

MRpc87 pursuit

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Kristin Rivera  on 

I've run into many instances where I was less than confident in the validity of recycling data from haulers.

1
Tue Apr 17, 2018, 8:58 pm

Verified Construction & Demolition Recycling Rates Pilot

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Juliana Moreira  on 

I am working on a commercial interiors project in London-UK. The standard for construction waste most commonly used in the UK is the PAS 402.

4
Director of Sustainability
Living Building Consultancy
LEEDuser Basic Member
6 thumbs up
Thu Feb 1, 2018, 8:29 am

Required to use facility weighted average?

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Eileen Gohr  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje

0

Certification agency meeting the ISO Guidelines

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Stephanie Graham  on 

Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide

0

Project diversion rate v. facility rate

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Deborah Ebersole  on 

If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin

1
Thu Jan 12, 2017, 6:47 pm

Verified Recycling

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Bharati Bhosale  on 

Apart for from added costs, are there additional requirements that the construction team should be aware of in terms of onsite sorting/ specific dumpster requirements that need to be met in-order t

1
Tue Jan 3, 2017, 4:29 pm

Pilot Credit 87: Verified C&D Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  David Dixon  on 

have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.

0

RCI CORR Information

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  John Danby  on 

I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.

0

Pilot Credit 87: Verified C&D Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Sara Greenwood  on 

Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.

2
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Tue Jan 3, 2017, 4:49 pm