5
Fri Nov 27, 2020, 5:48 pm

PV installation built and commissioned prior to Occupancy

CI-v4 EAc4:Renewable energy production
posted by  Gary Shlifer  on 

Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.

7
CEO
GreeNexus Consulting, LLC
LEEDuser Premium Member
0 thumbs up
Tue Sep 3, 2019, 7:15 pm

Wastewater Plant Methane-powered Fuel Cell

CI-v4 EAc4:Renewable energy production
posted by     on 

I have a project on a campus whose microgrid is in part served by a large fuel cell. The fuel cell is powered by waste methane gas purchased from a nearby wastewater treatment plant.

1
Tue Oct 30, 2018, 5:42 pm

Selling renewable energy

CI-v4 EAc4:Renewable energy production
posted by  Borja Sánchez  on 

Our project has a photovoltaic array that generates electricity which it´s sent totally to the grid, not being consumed directly in the building.

3
Architect
ÁRBOL Aquitectura Sostenible
LEEDuser Basic Member
0 thumbs up
Thu Jan 25, 2018, 5:38 pm

Estimate annual energy use of the office outside U.S.

CI-v4 EAc4:Renewable energy production
posted by  Ameet AA  on 

The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.

1
Fri Nov 24, 2017, 5:57 pm

Double- Counting of Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Bharath Ravuru  on 

Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?

1
Mon Aug 28, 2017, 2:09 pm

University Campus with Solar, not in Project LPB

CI-v4 EAc4:Renewable energy production
posted by  Sara Zoumbaris  on 

Our project is the renovation of an existing university building.

1
Mon Aug 28, 2017, 2:11 pm

Renewable Energy

CI-v4 EAc4:Renewable energy production
posted by  Maria Glädt  on 

See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.

1
Mon Aug 28, 2017, 2:22 pm

Renewable Energy in CS project

CI-v4 EAc4:Renewable energy production
posted by  Sara Johansson  on 

Is the tenant obliged to install additional renewable energy (or sign ownership/contract for off-site renewable energy) if the CS project fullfills criteria and recieves maximum (3) points?

2
Default Avatar
Büroleiterin
WSP Deutschland AG
LEEDuser Basic Member
5 thumbs up
Mon Aug 28, 2017, 2:17 pm