See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost. Calculate the project’s
percentage of renewable energy by the following equation:
% renewable energy = Equivalent cost of usable energy produced by renewable energy system/ Total building annual energy cost"
If the CS project fulfills the criteria for meeting maximum points on this credit and a lot of photovoltaics are installed, are the tenant obliged to install even more renewable energy sources? This doesn't seem correct.