See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost. Calculate the project’s percentage of renewable energy by the following equation: % renewable energy = Equivalent cost of usable energy produced by renewable energy system/ Total building annual energy cost" If the CS project fulfills the criteria for meeting maximum points on this credit and a lot of photovoltaics are installed, are the tenant obliged to install even more renewable energy sources? This doesn't seem correct.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.