Forum quick links
LEED Modeling Requirements for a CI projects
CI-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
We have a LEED CI project where our scope only includes 2nd floor and floors 10th to 16th of a 39 story building. My main question is;
90.1 Section 8.4.2 Automatic Receptacle Control for 220 volts systems
CI-v4 EAp2:Minimum energy performanceposted by Agustin Bertolotti on
Hi Everyone
We have a Project in a location where the electric supply is in 220 volts.
EnergyStar - product categories to be included in the calculations
CI-v4 EAp2:Minimum energy performanceposted by Agata Mozer on
Hi All,
ENERGY MODEL FOR OFFICE IN BASEMENT
CI-v4 EAp2:Minimum energy performanceposted by S S on
Hello to All,
Greetings!
I am doing the energy model for Office Building which has located in Basement. In our software, U value only can be given as input.
Mandatory to comply with ASHRAE 90.1 2010 Section 9.4.1 for Lighting Control?
CI-v4 EAp2:Minimum energy performanceposted by shashank gangil on
We recently received the review result of a LEED v4 Commercial Interior Project.
ENERGY STAR Appliances & Equipment Required for Federal Project
CI-v4 EAp2:Minimum energy performanceposted by David Hryvniak on
We are working on a project that is owned by the Federal Government. By law, all newly purchased equipment that is eligible must be ENERGY STAR certified.
controlled outlets in systems furniture?
CI-v4 EAp2:Minimum energy performanceposted by Courtney Royal on
Are controlled outlets required for systems furniture to meet the prerequiste?
Thanks you!
Courtney
Lighting system out of tenant scope
CI-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
For this requirement: "Areas and systems that are not part of the tenant scope of work are exempt."
Just to confirm that my understanding is correct
Laboratories guidelines mentioned in COMNET
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hello Everyone,
Greetings!...
[CI Energy Modeling] Receptacle Energy on Landlord Side
CI-v4 EAp2:Minimum energy performanceposted by Hyerim Kim on
Hi,
My project is a CI project, and scope is 2 story office area(22-24 floor) in a 30floor commercial building.