LEED ACP for District Energy (PEER) for ID+C?

CI-v4 EAp2:Minimum energy performance
posted by  Brian Salazar  on 

Hello!  We are working on a stand-alone building interior, located within a university campus.

1
Wed Oct 25, 2023, 12:28 pm

LPD for IT Rooms and IT Closet

CI-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

So according to 2010 ASHRAE 90.1, there is no LPD requirements for IT closets.  Yet the lighting for the project in question was adhereing to the ASHRAE 2016 90.1 standard, which has a space t

1
Sun Oct 8, 2023, 3:03 pm

AEDG for Libraries

CI-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

I have a CI project for a Library.  The team is looking to pursue prescriptive compliance for this credit.  The issue is when attempting to complete the AEDG table, I don't know which cat

5
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Fri Sep 29, 2023, 7:19 pm

Baseline Lab System for fit out

CI-v4 EAp2:Minimum energy performance
posted by  Cory Duggin  on 

I am working on a CI project that is the fit out of two floors of an existing lab building.  The only HVAC available to the fit out floors is 100% OA from the DOAS units and warm chilled water

2
Fri Sep 29, 2023, 2:30 pm

Baseline Building HVAC systems

CI-v4 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

Hi,

We are modeling a portion of a building.

The building counts with two dedicated outdoor air systems that provdie outdoor air to the whole building.

1
Fri Sep 29, 2023, 1:13 pm

Minimum Energy Performance

CI-v4 EAp2:Minimum energy performance
posted by  Nagaraj Sankar  on 

As we have a VRF system for fresh air, we design a seperate proposed case system module for the fresh air system.

1
Tue Aug 22, 2023, 2:57 pm

Option 2. Prescriptive Compliance

CI-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

kinda embarrassed to ask this one, but here goes...

6
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 15, 2023, 3:51 pm

Modeling baseline building envelope for CI project, Purchased energy (condenser water)

CI-v4 EAp2:Minimum energy performance
posted by  Yousef Abougabal  on 

Project Type: LEED ID+C (CI) Version 4

Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance

0

Model the Additional Lighting allowances for baseline and proposed cases

CI-v4 EAp2:Minimum energy performance
posted by  Michael   on 

My jewelry store (100m2) has general lighting on the ceiling and millwork lighting for decorative purposes. The general lighting is 16W/m2 compared to the baseline of 18 W/m2.

3
Default Avatar
Project Manager
LEEDuser Basic Member
14 thumbs up
Tue Feb 7, 2023, 5:21 pm