Office space only going for partial renovation.

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  shashank gangil  on 
We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors.
11
Tue Sep 30, 2025, 9:33 am
2
Thu Sep 19, 2024, 2:42 am

Including space in the the project boundary where only one trade is included in scope

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edgar Arevalo  on 

I have an ID+C project that takes up approximately half of a floor in a building.  When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it wa

0

Can ID+C be selected for whole building?

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Leo LeQuoc  on 

Our team is working on a project of a whole 2-storey (to be) newly constructed office building.

3
Wed Jan 31, 2024, 3:25 pm

One Tenant - two spaces across a public corridor - can this be certified as one project?

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Helen Kessler  on 

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple l

4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Jan 3, 2024, 1:25 pm

Store in a shopping mall with discontinuous boundaries

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Thomas Krysinski  on 

I am working on the LEED v4 ID+C certification of a store located in a shopping mall. The store is divided in two parts by the mall.

0

Non-continuous floors

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  David Edenburn  on 

I have seen this question asked but not answered. We have a client who will renovate three floors of an office building; typical CI project. The issue is that they will do floors 7, 17, 18.

7
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Sat Oct 24, 2020, 1:02 pm

LEED Project boundaries with Shared Elevator/Restroom Cores/Lobby

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Brian Kish  on 

I am working in a 9 story, existing building in downtown Pittsburgh, PA.  Our client has 3.5 floors of area that is part of our project scope of work.  The lobby, restrooms, elevators/sta

1
Tue Apr 7, 2020, 5:13 pm

Reasonable LEED Boundaries

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Marlen Aleman  on 

Hi, the scope of the project is to renovate the 3rd floor of a 5 storey building (all floors will be renovated eventually but the client wants to certify each floor as we go).

1