Post a question or comment
Credit Filters
Quality views
Filter by location
Forum
Topic
Replies
Recent

EQ Overview: Warehouse Quality Views requirement?

NC-v4 EQc8:Quality views
posted by  Instra Ingenieros  on 

According to LEED v4 EQ Overwiew " Table 2.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Feb 25, 2022, 5:17 pm

Pool area within natatoriums excluded?

NC-v4 EQc8:Quality views
posted by  Lyle Axelarris  on 

Does anyone know if pool decks and splash pad areas in an Aquatics Facility are exempted from this credit (similar to the exemption for gyms)?

0

How to calculate Area with Direct Line of site without 90 degrees??

NC-v4 EQc8:Quality views
posted by  Elisaa Wu  on 

I am confused as to how to calculate the "Area with Direct Line of Sight to the Outdoors via Vision Glazing (sq ft)" on the excel calculator form.

3
Wed Sep 29, 2021, 7:44 pm

Any LEEDv4 limits to borrowed views through interior glazing?

NC-v4 EQc8:Quality views
posted by  Joanna Switzer  on 

Under LEED 2009, exterior views "borrowed" by an interior space via interior glazing - basically viewing through an interior window to see an exterior window - used to be limited to (1) layer of in

5
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Mon Sep 13, 2021, 11:35 am

How to calculate "Area with Direct Line of Sight to the Outdoors via Vision Glazing" without a 90 degree angle?

NC-v4 EQc8:Quality views
posted by  Elissa Wu  on 

I am working on a project that has two regularly occupied spaces that do NOT have two 90 degree apart windows. I am instead going for Type 2 and Type 4.

6
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Sun Aug 15, 2021, 11:26 pm

View Type 3 with Permanent Obstruction Near Ceiling

NC-v4 EQc8:Quality views
posted by  Laura Heagler  on 

We have some spaces with vision glazing 12' and 16' head height. The spaces have exposed spiral ductwork.

3
GLMV Architecture, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jul 21, 2021, 4:01 pm

View type 3. Unobstructed views located within the distance of three times the head height of the vision glazing

NC-v4 EQc8:Quality views
posted by  Keith Robertson  on 

I find the Reference Guide explanation unclear. Page 749 includes a diagram of a compliant open office space and non-compliant open office space.

17
Wed Jul 21, 2021, 1:19 am
1
Mon May 17, 2021, 12:32 am

Photos of Views

NC-v4 EQc8:Quality views
posted by  Summer Minchew  on 

Has anyone been successful in achieving this credit using photos as documentation to demonstrate view type compliance?

3
Project Manager
VCA Green
LEEDuser Basic Member
1 thumbs up
Mon Sep 21, 2020, 9:14 pm