LCA: is waste % required?
NC-v4 MRc1:Building life-cycle impact reductionposted by Alexandra Kravel on
I'm curious if % of materials waste is typically included in the LEED LCA analysis? Not seeing a specific language for it on the LEED guide.
Historical building and Existing building part of connected structure
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
I have courthouse project that involves two existing buildings being connected with a newly constructed third building. Since one of the existing buildings connected to the third one is class
WBLCA - eutrophication impacts of wood
NC-v4 MRc1:Building life-cycle impact reductionposted by Kristen Dotson on
Asking for insight on the eutrophication impacts of wood when documenting WBLCA for LEED. Often times wood products show a DECREASE in global warming potential but an INCREASE in eutrophication.
Additions
NC-v4 MRc1:Building life-cycle impact reductionposted by Lorax Partnerships on
Our project is an addition built into the crotch of an L-shaped building.
Interior Renovations to Historic Building while maintaining historic status
NC-v4 MRc1:Building life-cycle impact reductionposted by Dimuth Kurukulaarachchi on
Would a project still qualify for Option 1 Historic Building Reuse if it has a local historic designation (requiring maintenance of the building exterior components)? Th
Changing structural systems between the baseline and proposed design
NC-v4 MRc1:Building life-cycle impact reductionposted by Ahmed Abd El Fattah on
Hello
Is changing from concrete structure to steel structure accepted in LCA?
Required Materials for LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by RDK E&S on
Hello,
We are looking for more information as to what details from Baseline and Proposed models need to be included in the models.
Whole Building LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Nove Sol on
I have three questions about whole building LCA. I have a client who wants to evaluate the impact of wood vs concrete building construction.
Building LCA analysis
NC-v4 MRc1:Building life-cycle impact reductionposted by Ahmed Abd El Fattah on
Hello
Would changing the structural materials from Steel to concrete or the other way count in LCA, given that both options have valid structural designs?
Structure re-use
NC-v4 MRc1:Building life-cycle impact reductionposted by Nicolas Martinez Ochoa on
Hello,