NC-v4 EAc2:Optimize energy performance
posted by  Sarah Leenknegt  on 

Hi

I have not yet found a clear description of the way of modelling a semiheated zone, so I will attempt to summarize. Please correct/append where needed.

7
Thu Dec 10, 2020, 10:26 pm

DES methodology

NC-v4 EAc2:Optimize energy performance
posted by  Ricardo Sá  on 

Dear All,

 

we’re currently working on LEED certification projects with the following characteristics:

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Tue Oct 20, 2020, 6:09 pm
11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 25, 2020, 9:55 pm

Proving Savings for a Utility-Owned Power Plant

NC-v4 EAc2:Optimize energy performance
posted by  Michael Hill  on 

I am wondering if anyone has any thoughts on how/if energy savings could be demonstrated for a Utility-Owned Electric Power Plant (just the plant itself).

3
Fri Sep 18, 2020, 7:38 pm

Multiple Pilot Credit (EApc111 7 EApc95) Implementation on EAc2

NC-v4 EAc2:Optimize energy performance
posted by  Rahil Shah  on 

Hello Everyone, 

I hope everyone is doing well and staying safe.

 

1
Wed Jul 29, 2020, 5:48 pm
1
Wed Jul 29, 2020, 1:34 pm

Min outside air requirements for unoccupied spaces/buildings - energy modeling

NC-v4 EAc2:Optimize energy performance
posted by  Pooja Sannamani  on 

Hi all,

We have an unoccupied building (sub station) that has corridors, toilet etc for very occasional maintenance occupancy. 

1
Wed Jun 10, 2020, 7:12 pm

IES thermal block and baseline model with system 6

NC-v4 EAc2:Optimize energy performance
posted by  Ying Lindsey  on 

Dear all, 
I need your professional opinion about a project that I am currently working on.

6
Thu May 28, 2020, 9:41 pm

Process HVAC modeling approach

NC-v4 EAc2:Optimize energy performance
posted by  Pooja Sannamani  on 

Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit. 

1
Thu May 28, 2020, 12:58 pm