NC-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
I have not yet found a clear description of the way of modelling a semiheated zone, so I will attempt to summarize. Please correct/append where needed.
DES methodology
NC-v4 EAc2:Optimize energy performanceposted by Ricardo Sá on
Dear All,
we’re currently working on LEED certification projects with the following characteristics:
Off-site renewables calculated in Optimized Energy Performance in LEED v4
NC-v4 EAc2:Optimize energy performanceposted by Deb Favaretto on
Hi,
Proving Savings for a Utility-Owned Power Plant
NC-v4 EAc2:Optimize energy performanceposted by Michael Hill on
I am wondering if anyone has any thoughts on how/if energy savings could be demonstrated for a Utility-Owned Electric Power Plant (just the plant itself).
Multiple Pilot Credit (EApc111 7 EApc95) Implementation on EAc2
NC-v4 EAc2:Optimize energy performanceposted by Rahil Shah on
Hello Everyone,
I hope everyone is doing well and staying safe.
Climate Data for Energy model -which year to use?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leed Users,
Min outside air requirements for unoccupied spaces/buildings - energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi all,
We have an unoccupied building (sub station) that has corridors, toilet etc for very occasional maintenance occupancy.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
Can COMcheck be used for EAc2 compliance ?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,