Getting Credit for Demand Control Ventilation in the Optimize Energy Performance credit

NC-v4 EAc2:Optimize energy performance
posted by  Mark Terpstra  on 

I have a project with a CO2 sensor in the return air duct of a workshop in a school.

0

Question about calculating the % of Improvement in Energy Performance - Projec with PV arrays

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Dear LeedUsers,

In our  project we have PV arrays which produce electricity and provide this electricity to the Network.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sun Feb 12, 2023, 6:21 am

Regarding Energy Simulation

NC-v4 EAc2:Optimize energy performance
posted by  Nagaraj Sankar  on 

In one of our LEED ID+C project, we are having scope of 8th floor and the total floor of the building is 12 floor. 

1
Tue Jan 31, 2023, 2:21 pm

Resort: Baseline HVAC

NC-v4 EAc2:Optimize energy performance
posted by  Amal Venugopal  on 

 Greetings!...

We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA.

1
Fri Jan 27, 2023, 7:00 pm

Can Core and Shell point thresholds apply to New Construction projects with 50% unregulated energy cost in LEED v4?

NC-v4 EAc2:Optimize energy performance
posted by  Michael   on 

Hi LEED experts, in LEED v4.1, NC projects with more than 50% unregulated energy cost can apply CS point thresholds to count points. I would like to ask if LEED v4 also applies 

4
Default Avatar
Project Manager
LEEDuser Basic Member
14 thumbs up
Thu Jan 5, 2023, 2:46 pm

Table 7.8 DHW performance requirements for electric instantaneous water heater

NC-v4 EAc2:Optimize energy performance
posted by     on 

I see there is "Gas Instantaneous Water Heaters" in Table 7.8, but there is not an "Electric Instantaneous Water Heater" in the table.  Is the "Electric Water Heaters" term meant to be generic

1
Mon Dec 5, 2022, 9:05 pm
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 28, 2022, 6:40 pm

Baseline System for District Energy System (DES) Option 2

NC-v4 EAc2:Optimize energy performance
posted by  Keith Lane  on 

I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the DES guidelines.

3
Default Avatar
Project Engineer
GGD Consulting Engineers
LEEDuser Basic Member
0 thumbs up