ASHRAE Office Occupancy Schedule & Fan Control
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi
3
Sat Dec 21, 2019, 1:54 am
VAV Fan-Powered Box Minimum Stop
CS-v4 EAp2:Minimum energy performanceposted by Saif Alsaeed on
Hi,
4
Fri Dec 20, 2019, 5:02 pm
Mandatories ASHRAE 90.1-2010 for tenants in Core&Shell LEED v4
CS-v4 EAp2:Minimum energy performanceposted by Mauricio Ramirez on
Hello Dear
1
Wed Oct 30, 2019, 1:41 am
Mandatory Provision for Lighting Controls C&S
CS-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile.
1
Fri Dec 20, 2019, 4:06 pm
Modeling baseline with System 2 of proposed hotel building with system 8
CS-v4 EAp2:Minimum energy performanceposted by Natalia Quintanilla on
Hi,
3
Mon Oct 14, 2019, 6:50 pm
Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 EAp2:Minimum energy performanceposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.
1
Tue Sep 3, 2019, 7:57 pm
Baseline Modeling
CS-v4 EAp2:Minimum energy performanceposted by Pan Pan on
Hi! According to appendix G if the system is 5 to 10, each floor must be modelled with a separate HVAC.
1
Tue Sep 3, 2019, 6:36 pm
Core Shell Daylighting
CS-v4 EAp2:Minimum energy performanceposted by Lorey Flick on
My core and shell building is over 400K SF. The majority of which is tenant space that is NOT fit out. There is no way of knowing a typical layout given the large, varying floor plate.
6
Tue Jun 18, 2019, 9:42 pm
Core & Shell Data Center (saving from IT load in tenant spaces)
CS-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
3
Tue May 28, 2019, 4:11 pm
DES - Option 1, Path 1. ASHRAE 90.1–2010, Appendix G of LEED v4 BD+C
CS-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
Hi,
Greetings!
1
Thu May 16, 2019, 12:58 pm