CS-v4 EAp2:Minimum energy performance

Baseline Modeling

Hi! According to appendix G if the system is 5 to 10, each floor must be modelled with a separate HVAC. Can I apply for exception, separate hvac system, if in a certain floor there are spaces which are conditioned only, no ventilation supplied as designed in the proposed? The project is located in Climate zone 1A.
0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/03/2019 - 18:36

If one of the exceptions to G3.1.1 applies then sure you can do that. Hard to know without more specifics on your particular situation.