CS-v4 EAp2:Minimum energy performanceposted by Shashank Singh on
Hi Folks,
HVAC system within the scope of tenant
CS-v4 EAp2:Minimum energy performanceposted by Ashish Nautiyal on
Hello All,
OA Flow to enter in MEPC
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We are facing the following issue, for which we’d need some assistance/advice.
Minimum Energy Performance Review Phase
CS-v4 EAp2:Minimum energy performanceposted by Eric Kim on
Hello,
I have a question about the project review.
Our project was conducted by Spilt Review.
Proposed HVAC system modeling for shell space
CS-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My question is regarding how the proposed hvac system should be modeled when the C&S design includes a DOAS w/a DX CC and gas HC which is capped at the shafts, therefore there are no ductw
Core & Shell proposed model
CS-v4 EAp2:Minimum energy performanceposted by Ying Lindsey on
Dear all,
Vestibule required in CS industrial building?
CS-v4 EAp2:Minimum energy performanceposted by Shannon Oletic on
Wondering if a CS industrial project (cold, dark shell) with unknown tenant must include a vestibule in the CS design, or if it can be assumed this will be provided as part of the tenant
Additional Interior Lighting Power
CS-v4 EAp2:Minimum energy performanceposted by Aris Koliopoulos on
Dear All,
Garage Fan Power Allowance
CS-v4 EAp2:Minimum energy performanceposted by Kristen Brozowski on
I have a two story 115,000 ft2 garage, that in the design has both supply and exhaust fans to maintain a pressure neutral design.
Tenant lighting fixtures installed but not wired up
CS-v4 EAp2:Minimum energy performanceposted by Varunya Jarunyaroj on
The owner of our LEED V4 CS project plan to provide lighting fixtures on the ceiling grid in the tenant space; however, they the wiring and control will be done by tenants due to different leased s