CS-2009 EAp2:Minimum Energy Performanceposted by Whitney Dorn on
The client is developing without a tenant and is deferring major HVAC components to the tenant build-out (air handlers.) Without air handlers, the energy model does not meet pre-requisite with opt
Ashrae 90.1, section 6.4 minimun equipment efficiencies
CS-2009 EAp2:Minimum Energy Performanceposted by Agustin Bertolotti on
Hello everyone We have a project in Uruguay in which our clients want to use a 350 tons centrifugal chiller with a 8.41 IPLV and 5.65 COP. Table 6.8.1C shows minimum efficiencies for this chiller
Mandatory provision in LEED CS
CS-2009 EAp2:Minimum Energy Performanceposted by Roger Moquin on
We actually construct a high rise office building with commercial area at the first level.
Insulation requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification.
Building Renovation
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Advanced Energy Modeling for LEED states "Existing buildings with less than 50% renovation should not be rotated,...". How can one calculates renovation percentage of an existing building?
ASHRAE 90.1 APPENDIX G Existing Building Model including shading
CS-2009 EAp2:Minimum Energy Performanceposted by Fabiano Castro on
We are modelling a Major Renovation Project under the ASHRAE 90.1-2007 - APPENDIX G.
Tenant Scope, Owner Scope, Tenant Guidelines
CS-2009 EAp2:Minimum Energy Performanceposted by Jennifer Preston on
I'm sure this questions has be asked before, but I cant seem to find the answer. Do forgive me if its repetitive. Where is the line between tenant scope, owner scope and the Tenant Guidelines?
EAp2 Section 1.4 tables.xls
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am in need of help with EAp2 Section 1.4 tables.xls. This project is for new construction. 1. What means “Semi-conditioned”?
LEED Boundary and equipment
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.
Number of HVAC systems
CS-2009 EAp2:Minimum Energy Performanceposted by Joel Kerschen on
We are designing a retail strip center. Due to the size, the baseline system is VAV w/ reheat. The proposed design is using CV RTUs.