Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

Minimum MEP system & Advanced Buildings Core Performance Guide

CS-2009 EAp2:Minimum Energy Performance
posted by  Kerrie Racicot  on 

We are working on a core & shell project. Is there a minimum MEP system needed to use the Advanced Buildings Core Performance Guide option?

2
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Wed Mar 17, 2021, 3:51 pm

COP and SFP values for energy modelling

CS-2009 EAp2:Minimum Energy Performance
posted by  shashank jain  on 

(for a office building in Sao Paulo) COP: For an office building in Sao Paulo, the proposed case uses air cooled system with a COP value of 2.87.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Nov 18, 2020, 2:41 pm
3
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Fri May 8, 2020, 9:32 pm

Installed and not Installed HVAC

CS-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Hi,

I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.

4
Wed Jan 8, 2020, 11:10 am

heat recovery in baseline

CS-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I'm using  v2009_Minimum Energy Performance Calculator_v09.xlsm

3
Sun Dec 22, 2019, 10:22 pm

Claim savings with reference to tenant fit out lighting drawings in lieu of tenant lease agreement

CS-2009 EAp2:Minimum Energy Performance
posted by  Eric Dixon  on 

I have a situation where my company has been contracted to design and submit for LEED both the C&S for the building developer, and the CI for the tenant.

2
Default Avatar
SmithGroupJJR
LEEDuser Premium Member
1 thumbs up
Tue Nov 5, 2019, 4:10 pm

AHU Fan Power Requirement

CS-2009 EAp2:Minimum Energy Performance
posted by  Summer   on 

I have a CS project in which the AHU will be provided by the tenant, since our energy modelling has been already simulated, we have no energy savings because of the missing information for the AHU

1
Fri Sep 20, 2019, 4:04 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jun 14, 2025, 11:19 am