Topic | Recent |
---|---|
Energy Rates for CHP used ProjectNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Jan 28, 2016, 10:12 amSAMY Chamy Enginneer T&T Green LEEDuser Basic Member 12 thumbs up January 31, 2016- 11:33 pm Awaiting for your reply Log in or register to post comments Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11478 thumbs up February 1, 2016- 9:53 am Samy, please see our FAQ on forum etiquette. Thanks! Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up February 1, 2016- 1:39 pm The rate used for the CHP in the proposed must be identical to the rate used in the baseline. You can't use... Last reply: Marcus Sheffer, Jun 26, 2017, 9:24 am |
|
Use of Table fans in Working DeskNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by SAMY Chamy on Dec 21, 2015, 8:48 am
Dear all Our production area is sewing machines so we install table fan with switches in every sewing table. Is it acceptable method in Individual controls Is there any... Last reply: Lauren Sparandara, Jan 8, 2016, 1:15 pm |
|
Exhaust RequirementNC-2009 IEQp1: Minimum indoor air quality performanceposted by SAMY Chamy on Nov 2, 2015, 2:18 am
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local... Last reply: Andrew Mitchell, P.E., Nov 2, 2015, 8:15 am |