Log in
Forum
Topic

Is garbage truck parking counted at waste hauler facility?

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Kendal Neitzke on Dec 9, 2010, 10:22 am

The project in question is an existing site for an existing garbage truck maintenance facility where the existing maintenance facility is being replaced with a new building. There are additional...

Last reply: Tristan Roberts, Dec 28, 2010, 11:28 pm

Option 1 flush out- Path 1

Schools-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Keelan Kaiser on Dec 15, 2010, 4:42 pm

Working on a school that will be completed by June 1, moving furnishings in July 1, and people in August. We have the month of June for flush out, hypothetically. We want to chase this credit,...

Last reply: Tristan Roberts, Dec 28, 2010, 11:08 pm

Example Roof Maintenance Program.

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Jorge Lopez de Obeso on Dec 8, 2010, 12:28 pm

Do any of you guys have a complete roof maintenance program that can be shared? I'm not sure if the document needs to be as simple as it sounds or would need to have a number of specifications....

Last reply: Tristan Roberts, Dec 28, 2010, 10:58 pm

Limit Boundary-

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by gabriel Morales on Dec 6, 2010, 5:42 pm

The project is located on a 2.67 ha L-shaped site and it consists on the following:
• 4 underground levels of parking
• 3 levels of retail (covering the entire site)
• 3 towers...

Last reply: Tristan Roberts, Dec 28, 2010, 9:45 pm

Elaras Question- LEED Certification for High-Rise Multi-family

General forums
posted by Dan Ackerstein on Dec 28, 2010, 7:09 pm

In theory, EBOM...

gross floor area

General forums
posted by Tristan Roberts on Dec 28, 2010, 6:19 pm

No, I don't think you need to include this, just as you wouldn't include an outdoor parking lot. It's not occupied space.

Outdoor Air delivery monitoring with increased ventilation rate

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Suraj Shah on Dec 21, 2010, 4:36 am

How does the alarming system work if the project is attempting IEQ credit 2, wherein 30% extra fresh air is provided? Does the set point then change to the designed fresh air quantity & then...

Last reply: Tristan Roberts, Dec 28, 2010, 6:12 pm

No adhesives used on a project

CI-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by ari meisel on Dec 14, 2010, 4:00 pm

I have a CI project isn't using ANY adhesives, I believe we meet the intent of the credit but it's not an option, anyone had that situation?

Last reply: Tristan Roberts, Dec 28, 2010, 6:08 pm

Linoleum production in USA

CI-2009 MRc6: Rapidly Renewable Materials
posted by Linda Davisson on Dec 20, 2010, 2:35 pm

I heard a rumor that linoleum may once again be manufactured in the USA. Anyone know a US manufacturer, or why linoleum is not manufactured in the USA?

Last reply: Tristan Roberts, Dec 28, 2010, 6:06 pm

SSC1 path 9, Innovative waste water technology

CI-2009 SSc1: Site Selection
posted by Jorng-ren Chern on Oct 7, 2010, 5:14 am

I have chosen to use the Option 1 to document the credit, but the SSc1 template seems to be “WRONG” in the following areas:

1. On the template it says: “The baseline for WE Credit 2 is...

Last reply: Tristan Roberts, Dec 28, 2010, 5:50 pm