Topic | Recent |
---|---|
Is garbage truck parking counted at waste hauler facility?NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Kendal Neitzke on Dec 9, 2010, 10:22 am
The project in question is an existing site for an existing garbage truck maintenance facility where the existing maintenance facility is being replaced with a new building. There are additional... Last reply: Tristan Roberts, Dec 28, 2010, 11:28 pm |
|
Option 1 flush out- Path 1Schools-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Keelan Kaiser on Dec 15, 2010, 4:42 pm
Working on a school that will be completed by June 1, moving furnishings in July 1, and people in August. We have the month of June for flush out, hypothetically. We want to chase this credit,... Last reply: Tristan Roberts, Dec 28, 2010, 11:08 pm |
|
Example Roof Maintenance Program.EBOM-2009 SSc7.2: Heat island effect - roofposted by Jorge Lopez de Obeso on Dec 8, 2010, 12:28 pm
Do any of you guys have a complete roof maintenance program that can be shared? I'm not sure if the document needs to be as simple as it sounds or would need to have a number of specifications.... Last reply: Tristan Roberts, Dec 28, 2010, 10:58 pm |
|
Limit Boundary-NC-2009 SSp1: Construction Activity Pollution Preventionposted by gabriel Morales on Dec 6, 2010, 5:42 pm
The project is located on a 2.67 ha L-shaped site and it consists on the following: Last reply: Tristan Roberts, Dec 28, 2010, 9:45 pm |
|
Elaras Question- LEED Certification for High-Rise Multi-familyGeneral forumsposted by Dan Ackerstein on Dec 28, 2010, 7:09 pm
In theory, EBOM... |
|
gross floor areaGeneral forumsposted by Tristan Roberts on Dec 28, 2010, 6:19 pm
No, I don't think you need to include this, just as you wouldn't include an outdoor parking lot. It's not occupied space. |
|
Outdoor Air delivery monitoring with increased ventilation rateCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Suraj Shah on Dec 21, 2010, 4:36 am
How does the alarming system work if the project is attempting IEQ credit 2, wherein 30% extra fresh air is provided? Does the set point then change to the designed fresh air quantity & then... Last reply: Tristan Roberts, Dec 28, 2010, 6:12 pm |
|
No adhesives used on a projectCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by ari meisel on Dec 14, 2010, 4:00 pm
I have a CI project isn't using ANY adhesives, I believe we meet the intent of the credit but it's not an option, anyone had that situation? Last reply: Tristan Roberts, Dec 28, 2010, 6:08 pm |
|
Linoleum production in USACI-2009 MRc6: Rapidly Renewable Materialsposted by Linda Davisson on Dec 20, 2010, 2:35 pm
I heard a rumor that linoleum may once again be manufactured in the USA. Anyone know a US manufacturer, or why linoleum is not manufactured in the USA? Last reply: Tristan Roberts, Dec 28, 2010, 6:06 pm |
|
SSC1 path 9, Innovative waste water technologyCI-2009 SSc1: Site Selectionposted by Jorng-ren Chern on Oct 7, 2010, 5:14 am
I have chosen to use the Option 1 to document the credit, but the SSc1 template seems to be “WRONG” in the following areas: 1. On the template it says: “The baseline for WE Credit 2 is... Last reply: Tristan Roberts, Dec 28, 2010, 5:50 pm |