Topic | Recent |
---|---|
CxA for Data Center that is only fully equiped partial floorNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Eric JS on Dec 16, 2010, 11:09 am
Hi all, would like to check if a data center project only install M&E equipment at 2 storeys out of 5 storeys within the first few years, will the... Last reply: Eric JS , Jan 31, 2011, 3:09 am |
|
UPS system need to be commissioned?NC-2009 EAc3: Enhanced Commissioningposted by Eric JS on Jan 30, 2011, 3:33 am
Hi all, UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power. In that case, do we include this in commisioning... Last reply: mike lackey, Jan 30, 2011, 3:09 pm |
|
Option 1-Pilot-Credits PC12: Reduced Automobile Dependenceposted by Habitech Distretto Tecnologico Trentino on Jan 21, 2011, 11:16 am
Hello, I am working on a LEED CI Project and I saw that it seems feasible to follow Option-1 “Transit-Served Location” for the project thanks to the location of the building. Before... Last reply: Habitech Distretto Tecnologico Trentino, Jan 29, 2011, 6:02 am |
|
refrigerant chargeEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by Pablo Fortunato Suarez on Aug 15, 2010, 11:51 pm
Based on actual calculations of the refrigerant charge value (lb/ton) some of the values are higher than the "default maximum allowable equipment refrigerant charge" according to table 2 of the... Last reply: Pablo Fortunato Suarez, Jan 28, 2011, 6:12 am |
|
SS P1 outside of the United StatesNC-2009 SSp1: Construction Activity Pollution Preventionposted by Martin Meehan on Jan 25, 2011, 9:46 am
For a building starting construction in February 2011 do we follow the... Last reply: Lisa Marshall, Jan 27, 2011, 5:48 pm |
|
Ventilation Baseline and ProposedNC-2009 EAp2: Minimum Energy Performanceposted by Chris Mullinax on Jan 20, 2011, 12:22 pm
I am currently modeling a 51,000 sq.ft., two story building. The baseline HVAC system per ASHRAE Appendix G, is a type 5 (PVAV). The baseline model incorporates one PVAV per floor. The proposed... Last reply: Christopher Schaffner, Jan 27, 2011, 12:09 pm |
|
Total ceiling area vs "Room Area" in online templateSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Renee Shirey on Jan 26, 2011, 6:08 pm
Our ceilings are pretty basic - they are just sloped (from 9' to 11'). I find it odd that the credit calls out for calculations based on the ceiling area, but the online template uses the... Last reply: Renee Shirey, Jan 27, 2011, 11:28 am |
|
Const. Waste Mgmt tracking sheet- success in using it?Schools-2009 MRc2: Construction Waste Managementposted by Renee Shirey on Jan 20, 2011, 11:19 am
I like the setup of the Const. Waste Mgmt tracking sheet in the Documentation Toolkit area, but the way the document is programmed, you can't add any other Material Categories. Has anyone had... Last reply: Valerie Walsh, Jan 26, 2011, 6:31 pm |
|
PVC carpet (a contradition with low VOC?)Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Walter Currin on Jan 21, 2011, 5:28 pm
I have been in conversations with a carpet supplier that indicates that their carpet meets the... Last reply: Reinhard Oppl, Jan 26, 2011, 6:07 pm |
|
Is PC9 seen as an additionalPilot-Credits PC9: Street Networkposted by Michael Miller on Sep 9, 2010, 2:14 pm
Is PC9 seen as an additional compliance path for SSc2 Development Density and Community Connectivity, or a separate credit? I did a test count of intersections for a project that should be... Last reply: Carter Williams, Jan 26, 2011, 4:57 pm |