phased construction and LEED certification

General forums
posted by Tristan Roberts on May 19, 2011, 4:27 pm

Thomas, it sounds to me like certifying the completed project (after Phase III) makes the most sense. Interrupting the flow of things seems like it adds more hassle. This is also a more "honest"...

keeping LEED records

General forums
posted by Tristan Roberts on May 19, 2011, 4:23 pm

Reynaldo, can you clarify what you have in mind? What records are you keeping, and for what purpose?
Doing...

Owner as required signatory

Schools-2009 IEQc7.2: Thermal comfort - verification
posted by Kathleen Lawson on May 9, 2011, 10:04 am

Was the Owner the required signatory in Schools 2007? Submitting final documentation now under that version, have been made aware of the Owner's proceedure for surveying and implementing...

Last reply: Tristan Roberts, May 19, 2011, 4:06 pm

Annual building energy determination

Schools-2009 EAc2: On-Site Renewable Energy
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 16, 2011, 8:24 am

Does this credit require the sum of ALL energy uses (electricity, gas, etc.) for the proposed building be the basis for determining the...

Last reply: Tristan Roberts, May 19, 2011, 3:51 pm

Concrete Block Filler

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Dan Dokken on Feb 28, 2011, 5:37 pm

In reference to the addendum for Table 1 IEQc4.2 Applicable...

Last reply: Josh Jacobs, May 19, 2011, 3:40 pm

VOC Excluding Exempt and Including Exempt

CI-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Alan Bernstein on May 18, 2011, 2:05 pm

I have two products that were used on our project. A primer and paint. The cut sheets from Manufacturer state the...

Last reply: John Drigot, May 19, 2011, 11:25 am

C&S scope

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Rubén M. R. on May 12, 2011, 6:15 pm

We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors.
Air handling units will be installed on all floors except in the gym...

Last reply: Susann Geithner, May 19, 2011, 11:14 am

Operable Windows

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Luis Miguel Diazgranados on May 18, 2011, 6:25 pm

We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area....

Last reply: David Posada, May 18, 2011, 7:30 pm

Existing refueling station

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Maura Adams on Feb 9, 2011, 11:12 am

We have a refueling station on our campus from a previous LEED project. It's about 1/4 mile from the new building and there's a walking path between the two parking areas. Do you think this would...

Last reply: Susan Walter, May 18, 2011, 5:47 pm

Donation of existing furniture

NC-2009 MRc2: Construction Waste Management
posted by Ron Frank on Sep 22, 2010, 12:37 am

We donated from our project in San Francisco a lot of used furniture to schools and Fire Department that avoided going to Land Fill sites. Can we utilize this against percentage for MRc2 for...

Last reply: Renee Shirey, May 18, 2011, 5:01 pm