Submit in Design review but include manuf. cuts in Const ReviewSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Renee Shirey on Sep 23, 2011, 1:19 pm
The prereq requires manufacturer cut sheets for the accoustic materials. This is a state funded project and we cannot single-source products - we must offer contractors at least 3 manufacturers... Last reply: David Posada, Sep 30, 2011, 4:47 pm |
|
ANSI S12.60-2002 vs LEED TemplateSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Brian Moran on Sep 19, 2011, 2:42 pm
The ANSI S12.60-2002 standard requires that core learning spaces, between 10,000 and 20,000 cubic feet, have reverberation times that do not exceed .7 seconds. The LEED template states that... Last reply: Daniel Hicks, Sep 30, 2011, 12:41 pm |
|
Ceiling areaSchools-2009 IEQp3: Minimum Acoustical Performanceposted by cathi schar on Sep 23, 2011, 9:12 pm
We have tectum panels (acoustic/insulation panels) above our beams. Do we have to add additional panels to the wall to make up for the ceiling area occupied by the exposed ceiling... Last reply: Daniel Hicks, Sep 30, 2011, 12:29 pm |
|
LEED 2009 Music SchoolsSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Brian Moran on Sep 19, 2011, 2:48 pm
IEQ p3 is a requirement of LEED for Schools 2009. I would like to see if anyone has worked on documenting compliance for a school under the ANSI standards calculations. Specifically, it... Last reply: Daniel Hicks, Sep 30, 2011, 12:13 pm |
|
Simplified ApproachSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Jean Marais on Aug 9, 2011, 3:16 am
I have a kindergarten, 7440sf, ground level only, all learning spaces are on perimeter with windows. There is only a small road on the one side about 20 m away. There is no Mechanical Ventilation... Last reply: Daniel Hicks, Sep 30, 2011, 12:07 pm |
|
Schools 2007 templateSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Keelan Kaiser on Jun 9, 2011, 11:57 am
We are finishing up reporting on a school addition, and I have a few questions about the template. We are using the "calculation" option for both reverberation time and stc. In the stc... Last reply: Daniel Hicks, Sep 30, 2011, 11:56 am |
|
synergies from LEED-NC to LEED-EBOMGeneral forumsposted by Tristan Roberts on Sep 29, 2011, 11:40 pm
Jeff, I think you will find the client is starting from scratch. Yes, they will have a good shot at certain credits based on their NC performance, but there is not a ton of overlap, and the... Last reply: Susan Walter, Sep 30, 2011, 11:47 am |
|
IIC in IEQc9Schools-2009 IEQc9: Enhanced Acoustical Performanceposted by Gary Madaras on Aug 29, 2011, 12:21 pm
Just want to double check . . . As far as I can see, there are no IIC requirements in IEQc9. Can someone confirm please? Thanks. Last reply: Daniel Hicks, Sep 30, 2011, 11:39 am |
|
Charging stations for oversized parking lotNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Thomas Gragnano on Sep 28, 2011, 9:56 am
We are working on an adaptive re-use project where the client has purchased an existing manufacturing facility and it is being coverted for use as an office and testing lab for a research... Last reply: Susan Walter, Sep 30, 2011, 11:27 am |
|
EAp2 Labs21 Climate zonesGeneral forumsposted by Allen Doyle on Sep 29, 2011, 1:56 pm
It would be helpful if there were more than two options for climate zones when using Labs21 benchmark: 1) site zone 2) the nation. If there are not enough peer buildings in 1), you are forced... |