Topic | Recent |
---|---|
waste auditing timelineEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Rachael McClain on Mar 31, 2010, 2:15 pm
Hi, I was wondering about the timeline. The reference guide reccomends performing the waste audit early in the performance period so improvements can be made over most of ther performance period... Last reply: Barry Giles, Dec 2, 2011, 4:59 pm |
|
Naturally Ventilated CorridorsEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Matthew Macko on Nov 30, 2011, 3:53 pm
Do corridors need to have access to operable windows within 25 feet? Last reply: Dylan Connelly, Dec 2, 2011, 2:56 pm |
|
Exterior Lighting Trespass for Campus ProjectNC-2009 SSc8: Light Pollution Reductionposted by Omer Moltay on Dec 2, 2011, 2:09 pm
We are working on a mixed use development where we have to achieve this credit for two buildings (with facade lighting) on a master site, but the buildings are only 16 m. apart from each other.... |
|
ASHRAE 90.1- Mandatory Provision 10.4CI-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sobral on Dec 2, 2011, 8:21 am
If EPAct 1992 does not reference 50Hz electrical motors, these don't need to comply with 10.4 minimum efficiencies? Last reply: Marcus Sheffer, Dec 2, 2011, 11:09 am |
|
LEED plaques not included for v2 projectsGeneral forumsposted by Tristan Roberts on Nov 13, 2011, 9:36 pm
Brian, thanks for noting this. Here is the rest of the GBCI... Last reply: Angie Plantz, Dec 2, 2011, 10:58 am |
|
IEQp1 compliance for high-rise with 1 outdoor air intakeEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Dawn Brenner on Apr 27, 2011, 2:06 pm
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007. The building has only one... Last reply: David Hubka, Dec 2, 2011, 10:08 am |
|
LEED NC 2.2 – Sunset DateLEED Rating System Selectionposted by Bryan Waters on Dec 1, 2011, 10:29 am
We have a project registered under LEED NC 2.2- After completion of Construction Documents of Phase 1; the project went on hold over a year ago. No submittals have been made to... Last reply: Susan Walter, Dec 2, 2011, 9:08 am |
|
SSc2 Option2CI-2009 SSc2: Development Density and Community Connectivityposted by Holly Himes on Sep 12, 2011, 6:34 pm
Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher... Last reply: Susan Walter, Dec 2, 2011, 8:59 am |
|
Documenting the credit...CI-2009 SSc2: Development Density and Community Connectivityposted by Jennifer Berthelot-Jelovic on Nov 28, 2011, 6:28 pm
I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity. That being said, how do I find the numbers that... Last reply: Susan Walter, Dec 2, 2011, 8:58 am |
|
Vacancy- EQp1 CalculationsEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Alice Cook on Jan 26, 2011, 5:50 pm
We have a floor that is vacant in our project building. In performing EQp1 calculations, I assume that # of occupants given for each zone should sum up to the total building occupants for other... Last reply: Dave Madsen, Dec 2, 2011, 8:23 am |