Topic | Recent |
---|---|
Major Renovation: Reuse: Foundation, Structural Steel, Etc.NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Sara LeMone on Jun 21, 2010, 1:37 pm
Currently working on a project where a 100,000sq.ft. PEMB is being demolished down to the steel... Last reply: Tristan Roberts, Jul 19, 2010, 2:40 pm |
|
Are smoking receptacles allowed at doorways?NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by John Klein on Jul 19, 2010, 12:32 pm
There will be no smoking in our buildings (DoD requirement); we will have smoking allowed outside the 25' perimeter outdoors. As such, would it violate the requirements of IEQp2 to have smoking... Last reply: Tristan Roberts, Jul 19, 2010, 12:38 pm |
|
pest management controlEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Pablo Fortunato Suarez on Jul 13, 2010, 12:39 pm
my client has existing pest management control policies but not as detailed as in the attached template (specific means of treating each pest - from ants, rodents, etc). will this be acceptable... Last reply: Pablo Fortunato Suarez, Jul 16, 2010, 1:15 pm |
|
I was wondering when writingEBOM-2009 IEQp3: Green Cleaning Policyposted by Rachael McClain on Jul 12, 2010, 3:06 pm
I was wondering when writing the cleaning policy do you include products and/or equipment that are used at the site in the approved product/equipment list even if they do not meet any of the... Last reply: Shira Norman, Jul 16, 2010, 12:47 pm |
|
Pesticide LogEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Yong Lee Low on Jul 6, 2010, 11:27 pm
Few of the pesticides used by our client do not have an EPA registration number but fall under WHO class III pesticides.Is it mandatory to put the EPA registration number in the log.Please advise... Last reply: Shira Norman, Jul 16, 2010, 12:38 pm |
|
Chris- both you and the ownerGeneral forumsposted by Allison Beer McKenzie on Jul 16, 2010, 11:41 am
Chris- both you and the owner would be fine creating the registration for Portfolio Manager- there is no requirement for who does it. I suggest, however, that you encourage the owner to be the... |
|
IEQc3.1 and IEQc3.2NC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Xing Shi on Jul 16, 2010, 4:09 am
According to LEED Online Form, the same... Last reply: Allison Beer McKenzie, Jul 16, 2010, 10:09 am |
|
Can we pursue LEED CI?CI-2009 SSc1: Site Selectionposted by Joel Loes on Jun 17, 2010, 11:34 am
We are a general contractor, and these days we've been doing a lot of tenant improvements around the city. As a demonstration tool for what we're capable of, we'd like to pursue LEED CI... Last reply: Erin Cooper, Jul 15, 2010, 2:54 pm |
|
Do bathrooms have to be accessible to shared fields?Schools-2009 SSc10: Joint Use of Facilitiesposted by Terry Squyres on Jul 14, 2010, 4:27 pm
Under Option 1, one of our shared uses will be the playing fields. Does anyone know if we have to provide restroom access? The old school does have shared playing fields, but doesn't provide... Last reply: Terry Squyres, Jul 14, 2010, 7:15 pm |
|
Design Phase vs. Construction Phase EQ7.1NC-2009 IEQc7.1: Thermal comfort - designposted by Christopher Schaffner on Jul 14, 2010, 6:53 pm
Just a note that the credit form has been revised to eliminate the requirement regarding transfer of O&M manuals during project close-out. There should be no hurdle in submitting this as a... |