Currently working on a project where a 100,000sq.ft. PEMB is being demolished down to the steel structure and foundation. We are recycling all of the metal sheeting, metal roof, wire, hardware, pipe, etc. on the job (contributing to Construction Waste Management). We are also crushing the existing parking lot into usable fill (contributing to Construction Waste Management).

Since we are resusing the foundation and the red iron frame of the building can this apply for buiding reuse, regional points or recycled (salvaged) content? Will the newly created usable fill from the existing parking be able to apply for recycled content, regional materials or building reuse?

Which credits cancel eachother out?