LEED O+M v4 Pilot Credit Integrative Process- Participation in the Forum

Pilot-Credits IPpc101: Integrative process
posted by Yanjun Xing on Dec 22, 2022, 4:15 am

Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s...

TX losses

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Omar Elrawy on Dec 21, 2022, 11:59 pm

Hi,

Just to confirm, for LEED Datacentre we do not model the transformer losses right?
Hence we do not have specific requirement for the losses at different part load?

Health and Wellbeing Path

NC-v4.1 IPc1: Integrative process
posted by Kelli Kimura on Jan 24, 2022, 5:45 pm

Hi all,

Our team is interested in the new health and well-being pathway of this credit and was wondering if others have taken it on? If so, would you be willing to share an example of what...

Last reply: Kelli Kimura, Dec 21, 2022, 12:54 pm

School:Environmental Site Assessment

Schools-NC-v4 SSp2: Environmental Site Assessment
posted by ashitha R on Dec 21, 2022, 5:32 am

Can anyone please share the template of ESA template for school project 

Legal Wood ACP- LEED V3

Pilot-Credits MRpc102: Legal Wood
posted by Jason V on Dec 20, 2022, 3:48 pm

Is product data supporting...

Parapet Capping

Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copper
posted by Cory Duggin on Dec 20, 2022, 12:04 pm

What alternative to lead have you used for parapet caps to comply with no lead roofing or flashing?

Clean room ventilation and systems- Process Load

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on Dec 7, 2022, 11:43 am

Hi all,

I've been searching around the Q&A's given about the ventilation of laboratory / manufacturing spaces. However I am still not sure on how to address some issues. As such,...

Last reply: tan guan han, Dec 20, 2022, 9:18 am

EV chargers

NC-2009 EAp2: Minimum Energy Performance
posted by Brightworks Sustainability on Mar 2, 2018, 5:28 pm

We are building a parking...

Last reply: Vincenzo Binetti, Dec 19, 2022, 12:47 pm

asking about thermal comfort

NC-v4.1 EQc5: Thermal comfort
posted by Nagaraj Sankar on Dec 16, 2022, 8:01 am

Hi all,

In thermal comfort how can we achieve the 1 point by  proving that controls (Air temperature, Air speed, Thermostat, operable windows)  which we given in regular spaces in Both V4...

Last reply: Nagaraj Sankar, Dec 18, 2022, 11:16 pm

How to determine which rating system in Green vehicles credit is more stringent for Campus project?

NC-v4 LTc8: Green vehicles
posted by Maysoon Al-Khuraissat on Dec 15, 2022, 2:31 am

Hi, I'm working on a Campus project that mainly has dormitories, warehouses, services, and offices, the manufacturer's area is almost 65% of the total...

Last reply: Maysoon Al-Khuraissat, Dec 18, 2022, 1:10 am