ASHRAE 90.1:2010 Pipping insulation Table, note d. direct-buried heating and hot-water systems pipingNC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Feb 3, 2023, 4:56 am
Hello, We’re currently involved in the LEED Certification of a new building to be built in Portugal. In what relates with pipping insulation, we have a doubt related with one of... Last reply: Ricardo Sá, Feb 7, 2023, 11:34 am |
|
HVAC Background Noise Measurement- must be done by Acoustic Consultant?NC-v4.1 EQc9: Acoustic performanceposted by Eunice Chong on Feb 6, 2023, 9:59 pm
Hi fellow LEED experts, I have an office project which does not have an Acoustic Consultant (this is an ID project but thought I might get better luck posting it here too as it may also... |
|
Where to find Evapotranspiration Rates of a location?NC-v4 WEc1: Outdoor water use reductionposted by Zirjay Villanueva on Oct 27, 2020, 10:54 pm
In the v4_Outdoor Water Use Reduction Calculator, there is a tab where you need to key in the Monthly Rainfall and Evaportranspiration Rate (ETo) for the location of the project. I've... Last reply: Priscilla Joseph, Feb 7, 2023, 2:00 am |
|
C&DWM Campus creditNC-v4 MRc5: Construction and demolition waste managementposted by Geoffrey Brock on Apr 12, 2022, 11:01 am
The LEED reference guide has the C&DWM Planning Pre-req as eligible for Campus credit, but the actual C&DWM credit has Campus INeligible (both are eligible for Group). Why?! C... Last reply: Sunnie Scott, Feb 6, 2023, 3:44 pm |
|
Formaldehyde and Urea-FormaldehydeNC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Abdulrahman Sherazy on May 29, 2012, 9:38 am
What I believe is there is a different between the formaldehyde and urea as a unique substances and the composite of urea-formaldehyde. Most of test reports I got for composite... Last reply: Bindhya PS, Feb 6, 2023, 1:09 pm |
|
Pilot credit: Safety First: Re-Enter Your WorkspaceCI-v4 INc1: Innovationposted by Małgorzata Ćwierz-Jarnot on Apr 28, 2021, 5:37 am
How the daily jurnal with building managements and occupants are documented on your projects? Do you provide online questionnaires or other means of communication? Last reply: Lorax Partnerships, Feb 6, 2023, 12:39 pm |
|
Major Renovation Project- Spaces out of Scope of WorkNC-v4 EQp1: Minimum indoor air quality performanceposted by Zeynep Cakir on Feb 6, 2023, 3:40 am
Hello everyone, My question is related to major renovation projects. Are the spaces not undergoing renovation and out of scope of renovation work exempt from the credit requirements? ... |
|
Need to get clear Idea about requirement of Enhanced IAQNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Nagaraj Sankar on Feb 6, 2023, 1:25 am
In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces... Last reply: Maria Porter, Feb 6, 2023, 3:10 am |
|
Base building Core vs. Tenant MeteringCS-v4 EAc3: Advanced Energy Meteringposted by Rebecca Hatchadorian on Jan 27, 2023, 10:33 am
A large office building is being certified using LEED Core & Shell. The project currently shows electrical meters on each floor that meter panels with circuits dedicated for both... Last reply: Marcus Sheffer, Feb 3, 2023, 5:22 pm |
|
Clear opening width for doorsPilot-Credits INpc125: Inclusive Designposted by Jennifer Atherton on Feb 3, 2023, 12:50 pm
Hello, Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway? |