Topic | Recent |
---|---|
Mandatory Compliance FormsCI-2009 EAp2: Minimum Energy Performanceposted by Rachael Green on Jul 8, 2010, 1:34 pm
We are moving into a building that is applying for LEED certification under NC. Our space is applying for CI v3.0 certification. Our engineers filled out the ASHRAE Compliance Form -- HVAC.... Last reply: Paul Conrad, Jul 8, 2010, 1:42 pm |
|
Daily avarage use for soccer arenasNC-2009 WEp1: Water Use Reductionposted by Adriana Hansen on Jun 28, 2010, 10:34 am
In Brazil, some of the Soccer Stadium designed for the FIFA WORLD CUP 2014 is looking for LEED certification. One of them was designed considering a peak daily occupancy of 45000 visitants... Last reply: Allison Zuchman, Jul 7, 2010, 1:39 pm |
|
Include Fixtures in Areas to be Fitted Out in Future?NC-2009 WEp1: Water Use Reductionposted by Kimberly Frith on Jun 29, 2010, 9:48 am
We are working on a recreational facility with a cafe portion that will be fitted out by the future tenant, who is yet unknown (the rest of the facility will be fully finished). Our design for... Last reply: Allison Zuchman, Jul 7, 2010, 1:13 pm |
|
Civil work under landlord scopeNC-2009 SSp1: Construction Activity Pollution Preventionposted by Dee Spiro on Jul 6, 2010, 8:54 am
We are building a new building but the site work is being performed by the landlord. Do we have to require that the landlord meet complete the documentation or is this pre-req considered out of... Last reply: Tristan Roberts, Jul 6, 2010, 9:47 am |
|
No hard deadlineGeneral forumsposted by Tristan Roberts on Jul 5, 2010, 8:27 am
Grace, I am not aware of any firm deadline to apply for LEED for any of the Design and Construction rating systems. Last reply: Grace Ming, Jul 6, 2010, 7:36 am |
|
Hazardous materialsNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Mara Baum on Jun 15, 2010, 7:48 pm
Can anyone confirm that mold is considered to be a... Last reply: Anne Nicklin, Jul 6, 2010, 2:42 am |
|
Enhanced CommissioningCS-2009 EAc3: Enhanced Commissioningposted by James Thornton on Jun 30, 2010, 6:34 pm
I have a question and a comment. The question first: Is the cost per square foot fee mentioned in the article for Enhanced... Last reply: James Thornton, Jul 5, 2010, 6:09 pm |
|
Green Associate Continuing Education HoursCI-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Summer Gorder on Jul 5, 2010, 5:25 pm
Can someone studying for their Green Associate exam start accumulating their CE hours before they become a Green Associate? Last reply: Tristan Roberts, Jul 5, 2010, 5:31 pm |
|
discrepancy in main meter and sub; calibrationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Jun 22, 2010, 1:19 am
1) if there is a discrepancy between the actual main meter of the energy supplier and the submeter total (sub meter total is around 8 to 10% less), which data should we input for the portfolio... Last reply: Pablo Fortunato Suarez, Jul 5, 2010, 8:07 am |
|
CI 2009 Business centre: Equipment Energy star requirementCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Gurneet Singh on Jul 5, 2010, 2:26 am
One of our project "Business Centre" is going for CI 2009 ratings system. The project owner is leasing a space in a building and doing the interior layout i.e. lighting , furniture and HVAC. The... Last reply: Lauren Sparandara, Jul 5, 2010, 4:08 am |