Log in
Forum
Topic

Credit Template for SS4.4

CS-2009 SSc4.4: Alternative transportation - parking capacity
posted by Francis Porter on Nov 4, 2010, 7:48 am

I am pursuing this credit through Case 1 Option 1 for a Core and Shell project.

There seems to be a problem with the credit template, as the template is directing my project to select the...

Last reply: Tristan Roberts, Nov 12, 2010, 11:43 am

Annual electric consumption of process equipment

NC-2009 EAc1: Optimize Energy Performance
posted by Maya Karkour on Nov 9, 2010, 8:35 am

Hi there,

Our project is a shopping mall which will include process loads such escalators, lifts and IT equipments. The total demand load (KW) for these systems is easy to get from the...

Last reply: Marcus Sheffer, Nov 12, 2010, 10:07 am

Combine smoking room exhaust with restroom exhaust

CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Ralf Lehmann on Nov 4, 2010, 10:25 am

Sometimes it seams to be easier to combine the air duct system of the exhaust system of a restroom to that of a smoking room. In my oppinion there is no problem to match the requirement on the...

Last reply: Ralf Lehmann, Nov 12, 2010, 9:54 am

Required commissioning for On-Site Renewable Energy

NC-2009 EAc2: On-Site Renewable Energy
posted by Augusto Velazquez on Oct 31, 2010, 3:18 pm

The LEED NC 2009 briefly mentions that...

Last reply: Victoria Lockhart, Nov 12, 2010, 9:39 am

description of the potential savings

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jacob Goodman on Oct 19, 2010, 10:34 am

I recently recieved a review comment asking to expand the narritive of EAc1.3 Opt. 1 to include "description of the potential savings" as requested on the credit template. I am attempting only...

Last reply: Paul Conrad, Nov 12, 2010, 8:53 am

Industrial Ventilation Requirements

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Andrew Sheaffer on Oct 26, 2010, 2:02 pm

Given that ASHRAE 62.1 generally does not cover industrial spaces, how are people meeting this requirement for industrial buildings? Are you basing compliance off of the Industrial Ventilation...

Last reply: Roger Chang, Nov 12, 2010, 6:12 am

SRI of Decorative Rock for Roof

NC-2009 SSc7.2: Heat island effect - roof
posted by Dave Wortman on Nov 11, 2010, 5:13 pm

I am trying to find a white decorative rock material with a high...

Last reply: Tristan Roberts, Nov 12, 2010, 12:21 am

Hardscape minimum area

NC-2009 SSc7.1: Heat island effect - nonroof
posted by javier bolanos zeledon on Nov 10, 2010, 7:30 pm

Hi. This is a new 5000sqft office building within an industrial site. This new building will be attached to the main process area. At this moment everything surrounding the main process area is...

Last reply: Tristan Roberts, Nov 12, 2010, 12:20 am

Installation Dates for LEED On-line

EBOM-2009 EAc5: Enhanced Refrigerant Management
posted by Andrew Barnes on Nov 1, 2010, 4:29 pm

Good day everyone. For our project site we have listed all of the units,
calculated all of the leakage rates, etc. However there are a few of our units that do not have an accurate (precise...

Last reply: Tristan Roberts, Nov 11, 2010, 11:58 pm

VOC [carpet adhesive] content determined by rapid schedule

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Peter Feibelman on Nov 5, 2010, 1:52 pm

My builder has an accelerated construction schedule, a familiar pace for him. He reports that - with inadequate slab curing time - only a high...

Last reply: Tristan Roberts, Nov 11, 2010, 11:41 pm