Topic | Recent |
---|---|
Restaurants requirements of recyclabesCS-2009 MRp1: Storage and Collection of Recyclablesposted by BH . on May 11, 2011, 9:45 am
Does LEED require some extra recyclng/collector space for office building projects with restaurants, as it is i.e. in... Last reply: Tristan Roberts, May 19, 2011, 4:27 pm |
|
phased construction and LEED certificationGeneral forumsposted by Tristan Roberts on May 19, 2011, 4:27 pm
Thomas, it sounds to me like certifying the completed project (after Phase III) makes the most sense. Interrupting the flow of things seems like it adds more hassle. This is also a more "honest"... |
|
keeping LEED recordsGeneral forumsposted by Tristan Roberts on May 19, 2011, 4:23 pm
Reynaldo, can you clarify what you have in mind? What records are you keeping, and for what purpose? |
|
Owner as required signatorySchools-2009 IEQc7.2: Thermal comfort - verificationposted by Kathleen Lawson on May 9, 2011, 10:04 am
Was the Owner the required signatory in Schools 2007? Submitting final documentation now under that version, have been made aware of the Owner's proceedure for surveying and implementing... Last reply: Tristan Roberts, May 19, 2011, 4:06 pm |
|
Annual building energy determinationSchools-2009 EAc2: On-Site Renewable Energyposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 16, 2011, 8:24 am
Does this credit require the sum of ALL energy uses (electricity, gas, etc.) for the proposed building be the basis for determining the... Last reply: Tristan Roberts, May 19, 2011, 3:51 pm |
|
Concrete Block FillerNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Dan Dokken on Feb 28, 2011, 5:37 pm
In reference to the addendum for Table 1 IEQc4.2 Applicable... Last reply: Josh Jacobs, May 19, 2011, 3:40 pm |
|
VOC Excluding Exempt and Including ExemptCI-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Alan Bernstein on May 18, 2011, 2:05 pm
I have two products that were used on our project. A primer and paint. The cut sheets from Manufacturer state the... Last reply: John Drigot, May 19, 2011, 11:25 am |
|
C&S scopeCS-2009 IEQp1: Minimum indoor air quality performanceposted by Rubén M. R. on May 12, 2011, 6:15 pm
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors. Last reply: Susann Geithner, May 19, 2011, 11:14 am |
|
Operable WindowsCS-2009 IEQp1: Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on May 18, 2011, 6:25 pm
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.... Last reply: David Posada, May 18, 2011, 7:30 pm |
|
Existing refueling stationNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Maura Adams on Feb 9, 2011, 11:12 am
We have a refueling station on our campus from a previous LEED project. It's about 1/4 mile from the new building and there's a walking path between the two parking areas. Do you think this would... Last reply: Susan Walter, May 18, 2011, 5:47 pm |