Applying to LEED 2009 for NCEBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lampsposted by Emily Catacchio on Jul 27, 2011, 12:55 pm
I'm working on a project that would like to apply this credit to a new construction building. The new building is part of a college campus, but the LEED boundary only includes the new building.... Last reply: Jamie Brady, Aug 17, 2011, 5:22 pm |
|
Options and Paths for Pilot Credit 16Pilot-Credits SSpc16: Rainwater managementposted by Laura Millberg on Jan 12, 2011, 11:53 am
I'm confused by the Options and Paths for this credit. Does Option 2 achieve more credits than Option 1? Last reply: Chris Fleming, Aug 17, 2011, 3:53 pm |
|
Evidence RequiredPilot-Credits PC12: Reduced Automobile Dependenceposted by Méabh Browne on Jun 21, 2011, 5:42 am
We are working on LEED CI project and participating in this pilot credit, which we given the city centre location that we are in would be easily achieved. I wondered what evidecne would be... Last reply: Michael Smithing, Aug 17, 2011, 1:27 pm |
|
Energy and Water Data Release form- Option 3Schools-2009 EAc5: Measurement and Verificationposted by Rachel Birnboim on Aug 15, 2011, 5:21 pm
If we pursue this option, are we only eligable for one point for this credit? That's what is coming up on my template, even though it says that i'm pursuing two credits. Last reply: Marcus Sheffer, Aug 17, 2011, 12:26 pm |
|
Gross Lighted Area- ASHRAE 90.1-2007CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Trevor Karstens on Jul 7, 2011, 4:57 pm
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum... Last reply: Susann Geithner, Aug 17, 2011, 10:57 am |
|
Existing Fixtures Calculated in Installed Lighting Power?CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by David Rodriguez on Aug 16, 2011, 6:45 pm
I have a renovation project where there are three rooms in which we are not replacing the light fixtures. ASHRAE 90.1 Section 9.1.1 states, "..lighting requirements for existing building are... Last reply: Susann Geithner, Aug 17, 2011, 10:49 am |
|
Option 2, Outside USPilot-Credits PC12: Reduced Automobile Dependenceposted by Anna Korinkova on Aug 16, 2011, 8:22 am
Hi all, Last reply: Fred Dock, Aug 16, 2011, 4:31 pm |
|
Hard copy signaturesGeneral forumsposted by Mike Barker on Aug 16, 2011, 4:26 am
My observations, from an international point of view, are as follows :- 1) A hard copy, in the form of a comitment by the engineer on a company letterhead with his full signature, will... |
|
AGMBC Part IILEED Guidance for Campuses and Multiple Buildingsposted by Cara Mae Cirignano on Oct 26, 2010, 12:30 pm
Unfortunately, if your project is registered under a 2009 rating system, or not yet registered, we do not allow use of the 2005 document. We plan to publish AGMCB Part II in early 2011 - we... Last reply: Lindsey Perez, Aug 15, 2011, 4:13 pm |
|
Counting surfacesPilot-Credits PC19: Whole Building Reuseposted by Bradley Guy on Aug 15, 2011, 12:33 pm
Hello Heather, Last reply: Heather Walters, Aug 15, 2011, 1:16 pm |