Topic | Recent |
---|---|
EPD: products with same technical charachteristics but different thickness, are considered distincts products (BA13/BA15,NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on Nov 2, 2022, 9:23 am
Hello everybody, We used on our project plasterboards from the same manufacturer (Saint gobain), which have the same characteristics (acoustics, thermal resistance,...) but they are... Last reply: Denise Bevilaqua, Nov 2, 2022, 10:23 am |
|
According to ASHRAE 90.1, Is it mandatory to install occuppant sensors in electrical and mechanical rooms?NC-v4 EAp2: Minimum Energy Performanceposted by Sara BENLOUBA on Nov 1, 2022, 12:09 pm
According to ASHRAE 90.1 / Section 9.4.1.2 , Do we have to install occupant sensor or a timer switch in electrical and mechanical rooms? Thanks, Last reply: Marcus Sheffer, Nov 2, 2022, 9:32 am |
|
HPD: products with same technical charachteristics but different thickness, are considered distincts products (BA13/BA15, BA18)NC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on Nov 2, 2022, 9:25 am
Hello everybody, We used on our project plasterboards from the same manufacturer (Saint gobain), which have the same characteristics (acoustics, thermal resistance,) but they are different... |
|
Will a TSCA Title VI Certification Provide Credit for LEED Points?NC-v4.1 EQc2: Low-emitting materialsposted by Angela Rogers on Oct 5, 2019, 11:48 amErica Downs Sustainability Consultant The Green Engineer LEEDuser Premium Member 5 thumbs up January 6, 2020- 11:00 am Hi Angela- I was just looking for the same info. Hopefully you've received an answer to your question, but just in case, check this thread under NCv4: https://leeduser.buildinggreen.com/forum/us-epa-tsca-title-vi-ulef-products Log in or register to post comments Ralph Bicknese Principal Hellmuth & Bicknese Architects LEEDuser Premium Member 21 thumbs up May 15, 2020- 2:46 pm We have been working on the same issue but have not been able to find a definitive answer. We... Last reply: Erica Downs, Nov 1, 2022, 10:04 pm |
|
Performance Periods in LEED-EBOM: Rules to Follow--Do these apply to EBOM 4.1?Performance Periods in LEED-EBOM: Rules to Followposted by Brian Salazar on Nov 1, 2022, 4:43 pm
Hi. We’re working on a LEED... |
|
Cafeteria with patio seatingNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Margaret Montgomery on Mar 17, 2020, 6:20 pm
In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system? It might need to be the entire... Last reply: Emily Purcell, Nov 1, 2022, 1:19 pm |
|
Greenguard Gold in a First Floor of Home environment...NC-v4.1 EQc2: Low-emitting materialsposted by Patty Karapinar on Oct 26, 2022, 2:06 pm
Hello, I've received a Greenguard Gold certificate for conversion varnish for casework that says it is tested to CDPHv1.2-2017 for first floor of home environment (UL 2818-2013). Our... Last reply: Patty Karapinar, Nov 1, 2022, 11:50 am |
|
Construction Indoor air quality management plan for hospitalsHealthcare-v4.1 EQc3: Construction indoor air quality management planposted by Antonia Lymperopoulou on Nov 1, 2022, 5:23 am
Hello all, I am in the process of creating the Indoor Air Quality Management Plan for a Healthcare project. I have conducted Indoor Air Quality Management Plans for New Construction and... |
|
What type space to place it on the ARC platform for a Casino?LEED v4.1 Discussion Forumposted by LEED Pro Consultant on Oct 31, 2022, 5:28 pm
hello everyone, We are currently working on project O+M for existing buildings v4.1 for a casino in Mexico. I have doubts about what type space to place it on the ARC platform, if... |
|
Question about Option 4. Parking Under CoverEBOM-v4 SSc3: Heat Island Reductionposted by J.W. Shin on Oct 17, 2022, 3:42 am
We are working on a LEED O+M: existing building project with a multilevel parking space (10th floor mechanical parking) attached to the main building. There is no parking space on the top... Last reply: emily reese moody, Oct 30, 2022, 6:20 pm |