Topic | Recent |
---|---|
Option 4: CombinationNC-2009 IEQc8.1: Daylight and views - daylightposted by Rubén M. R. on Apr 5, 2011, 7:22 pm
My project is an industrial plant with several buildings (all buildings going for one certification). We have daylight simulations of some of them and we are measuring daylight on others. ... Last reply: Jill Perry, PE, Apr 12, 2011, 6:33 pm |
|
LEED Boundary and equipmentCS-2009 EAp2: Minimum Energy Performanceposted by Gabriela Hernández Castillo on Mar 18, 2011, 10:40 am
We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification. The entire parking lot will be underground (it will be three underground... Last reply: Gabriela Hernández Castillo, Apr 12, 2011, 6:16 pm |
|
Occupancy SensorsNC-2009 IEQc6.1: Controllability of systems - lightingposted by Lindsay Duncan on Mar 14, 2011, 1:51 pm
In the past... Last reply: David Posada, Apr 12, 2011, 4:06 pm |
|
Existing classrooms on an additionSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Joe Piedimonte on Apr 11, 2011, 6:50 pm
We have a project that is an addition to an existing school. The existing classrooms are included in the LEED boundary, but they have only had minor updates of mechanical systems. Does LEED for... Last reply: Tristan Roberts, Apr 12, 2011, 12:57 pm |
|
ESCO Performance ContractNC-2009 EAc2: On-Site Renewable Energyposted by Lauren Ford on Dec 27, 2010, 12:08 pm
If our project finances the on-site PV through an ESCO Performance Contract where the PV is owned and operated by a third party, but the electricity is sold back to the project/building owner - I... Last reply: Sam Keehn, Apr 12, 2011, 4:53 am |
|
SSc3 Brownfield DocumentationNC-2009 SSc3: Brownfield Redevelopmentposted by Josh Mauldin on Apr 11, 2011, 12:28 pm
Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey. The report we got... Last reply: Larry Sims, Apr 12, 2011, 1:58 am |
|
LEED Interpretation 1600 for LEED-NC 2009?NC-2009 EAc1: Optimize Energy Performanceposted by Dana Kose on Mar 29, 2011, 4:08 pm
... Last reply: Colin Inderwish, Apr 11, 2011, 4:31 pm |
|
Occupancy Sensors in LPD CalculationsCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Jennifer Perdue on Apr 11, 2011, 12:33 pm
Has anyone had experience in calculating additional reduction in... Last reply: Jennifer Perdue, Apr 11, 2011, 3:27 pm |
|
Manufacturer's Stockpile MaterialCI-2009 MRc3.1: Materials Reuseposted by Gary Keyfauver on Apr 10, 2011, 4:52 pm
I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project. However, we sometimes have a few units sent to... Last reply: David Posada, Apr 11, 2011, 12:45 pm |
|
Warehouse- Heating OnlyNC-2009 EAc1: Optimize Energy Performanceposted by Curt Pascoe on Apr 1, 2011, 4:14 pm
There has been much talk that warehouses with heating-only (no cooling) must still model a cooling system in the baseline and proposed case, since the space is defined as conditioned. Adding... Last reply: Curt Pascoe, Apr 11, 2011, 10:35 am |