Log in
Forum
Topic

Location and Product

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Lance Kinard on May 12, 2022, 8:33 am

Tommy Linstroth CEO Green Badger LEEDuser Expert 126 thumbs up May 13, 2022- 4:27 am Lance An EPD should be within the geographic range of the project- i.e. North America for US projects. We've seen some European EPDs accepted in US projects, but to be safe, it should be w/in the region. You can use a product across any BPDO credit- many products will have an EPD, and HPD and recycled content and contribute to all three credits. Log in or register to post comments Luciana Fernandes LEEDuser Premium Member May 26, 2022- 7:27 pm Hi Tommy,  Jumping in on this forum as I have a similar question. I have...

Last reply: Craig Graber, Aug 31, 2024, 2:46 am

Data cabling and carpet quantity difficulty

Pilot-Credits MRpc132: Procurement of Low Carbon Construction Materials
posted by Deb Favaretto on Nov 12, 2022, 9:16 pm

The language of the Pilot Credit now requires Communications (data cabling). 

We'd like to pursue this PC on our projects where we have already developed a WBLCA, so that we can take...

Last reply: Agnes Vorbrodt, Aug 30, 2024, 2:21 pm

Signage at all Entries including Vendor/Maintenance Access

NC-v4 EQp2: Environmental tobacco smoke control
posted by Michelle Rosenberger on Aug 29, 2024, 12:57 pm

Member 522 thumbs up August 29, 2024- 1:42 pm Thanks to both of you. Yes, I was looking at the v4.1 language due to your comment Dave on the forum about the 10' distance. The language reads to me like...

Last reply: Dave Hubka, Aug 30, 2024, 9:17 am

Rating and adaptation registration/selection

LEED Rating System Selection
posted by Jose Castorena on Jun 27, 2024, 10:40 am

Greetings.I am working on a project for a previously certified LEED community college campus (circa 2010). Our project consists of three buildings one of which is an existing...

Last reply: Andrey Kuznetsov, Aug 30, 2024, 5:32 am

GHG emissions calculations for LEED v4- 2024 Update

NC-v4 EAc2: Optimize Energy Performance
posted by Jacob Stieb on May 8, 2024, 6:20 pm

The 2024 update to LEED v4 splits the points into energy cost (site/source) and...

Last reply: Dat Nguyen, Aug 29, 2024, 10:31 pm

Opt 2 Embodied Carbon/LCA Optimization- Eligible materials in European Region

NC-v4.1 MRc2: Environmental Product Declarations
posted by Kairi Noulik on Apr 11, 2024, 6:44 am

Good day

I am working on projects in Estonia and we are trying to achieve the requirement for Opt 2 of this credit by choosing 5 materials from 3 different manufacturers.

During my...

Last reply: Allen Cornett, Aug 29, 2024, 5:17 pm

GEV Emicode: Low-Emitting Materials credit (v4.1)

NC-v4.1 EQc2: Low-emitting materials
posted by Marcelo Alencar Pereira on Aug 28, 2024, 4:59 pm

Good afternoon everyone,

We are working on a LEED BD+C NC certification project in Brazil and have identified adhesives and...

Last reply: Lauren Richardson, Aug 29, 2024, 8:20 am

Option 2 (prescriptive path) documentation?

NC-v4 EAp2: Minimum Energy Performance
posted by Erica Downs on Aug 19, 2024, 2:36 pm

I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG.  The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:34 pm

Sub-Metering for small service buildings

NC-v4 EAc3: Advanced Energy Metering
posted by Cyle Sheppard on Aug 20, 2024, 3:36 pm

I have a question from our Electrical Engineer that I am unsure on. 

Our building has several small service buildings at the rear of the property. We understand that we need to include...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:31 pm

Plug loads Process Loads savings vs baseline

CI-v4 EAc2: Optimize Energy Performance
posted by Xavier Valladares on Oct 3, 2019, 12:43 pm

Hi All,

Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if

...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:22 pm