Data cabling and carpet quantity difficultyPilot-Credits MRpc132: Procurement of Low Carbon Construction Materialsposted by Deb Favaretto on Nov 12, 2022, 9:16 pm
The language of the Pilot Credit now requires Communications (data cabling). We'd like to pursue this PC on our projects where we have already developed a WBLCA, so that we can take... Last reply: Agnes Vorbrodt, Aug 30, 2024, 2:21 pm |
|
Signage at all Entries including Vendor/Maintenance AccessNC-v4 EQp2: Environmental tobacco smoke controlposted by Michelle Rosenberger on Aug 29, 2024, 12:57 pmMember 522 thumbs up August 29, 2024- 1:42 pm Thanks to both of you. Yes, I was looking at the v4.1 language due to your comment Dave on the forum about the 10' distance. The language reads to me like... Last reply: Dave Hubka, Aug 30, 2024, 9:17 am |
|
Rating and adaptation registration/selectionLEED Rating System Selectionposted by Jose Castorena on Jun 27, 2024, 10:40 am
Last reply: Andrey Kuznetsov, Aug 30, 2024, 5:32 am |
|
GHG emissions calculations for LEED v4- 2024 UpdateNC-v4 EAc2: Optimize Energy Performanceposted by Jacob Stieb on May 8, 2024, 6:20 pm
The 2024 update to LEED v4 splits the points into energy cost (site/source) and... Last reply: Dat Nguyen, Aug 29, 2024, 10:31 pm |
|
Opt 2 Embodied Carbon/LCA Optimization- Eligible materials in European RegionNC-v4.1 MRc2: Environmental Product Declarationsposted by Kairi Noulik on Apr 11, 2024, 6:44 am
Good day I am working on projects in Estonia and we are trying to achieve the requirement for Opt 2 of this credit by choosing 5 materials from 3 different manufacturers. During my... Last reply: Allen Cornett, Aug 29, 2024, 5:17 pm |
|
GEV Emicode: Low-Emitting Materials credit (v4.1)NC-v4.1 EQc2: Low-emitting materialsposted by Marcelo Alencar Pereira on Aug 28, 2024, 4:59 pm
Good afternoon everyone, We are working on a LEED BD+C NC certification project in Brazil and have identified adhesives and... Last reply: Lauren Richardson, Aug 29, 2024, 8:20 am |
|
Option 2 (prescriptive path) documentation?NC-v4 EAp2: Minimum Energy Performanceposted by Erica Downs on Aug 19, 2024, 2:36 pm
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems... Last reply: Marcus Sheffer, Aug 28, 2024, 3:34 pm |
|
Sub-Metering for small service buildingsNC-v4 EAc3: Advanced Energy Meteringposted by Cyle Sheppard on Aug 20, 2024, 3:36 pm
I have a question from our Electrical Engineer that I am unsure on. Our building has several small service buildings at the rear of the property. We understand that we need to include... Last reply: Marcus Sheffer, Aug 28, 2024, 3:31 pm |
|
Plug loads Process Loads savings vs baselineCI-v4 EAc2: Optimize Energy Performanceposted by Xavier Valladares on Oct 3, 2019, 12:43 pm
Hi All, Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if ... Last reply: Marcus Sheffer, Aug 28, 2024, 3:22 pm |
|
Process loads- plug loadsNC-2009 EAc1: Optimize Energy Performanceposted by charles bell on Apr 17, 2013, 2:31 pm
Hello, Last reply: Marcus Sheffer, Aug 28, 2024, 3:21 pm |