Log in
Forum
Topic

TSS vs. SSC

NC-2009 SSc6.2: Stormwater design - quality control
posted by Melissa Wrolstad on Jan 24, 2011, 12:53 pm

Our client has installed a stormwater treatment technology that removes (per EPA testing) over 80% SSC (suspended solids concentration). Can I use SSC in lieu of...

Last reply: Amy Rider, Feb 8, 2011, 7:54 pm

LEED boundary and materials scope

NC-2009 MRc4: Recycled Content
posted by Janika McFeely on Feb 8, 2011, 5:01 pm

A project we're working on is replacing some of the city sidewalk, which is outside our property line and LEED boundary. Should we include the concrete in our material calculations? Thanks,...

Last reply: Janika McFeely, Feb 8, 2011, 7:42 pm

WEp1- Substantial Completion Date

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by susan eguia on Jan 27, 2011, 5:51 pm

As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system. What if the "date" is unknown, doesn't show in...

Last reply: susan eguia, Feb 8, 2011, 7:23 pm

just what I needed!

General forums
posted by Crystal Brokaw on Feb 8, 2011, 3:10 pm

This addition was so timely for our project. We just switched from LEED-NC to LEED-CI, but USGBC has not officially swtiched us on LEEDOnline so we do not have access to the templates yet....

Last reply: Crystal Brokaw, Feb 8, 2011, 6:59 pm

IEQ 8.1 Daylighting calculations for evening use spaces.

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Eri Spaulding on Feb 1, 2011, 5:19 pm

Hello,
I am seeking feedback for Office space which occurs in a volunteer Fire Station. The Office space will primarily be used after 5pm.
1. Would this room be included in the...

Last reply: Jill Perry, PE, Feb 8, 2011, 5:33 pm

Residential apartment in a dormatory building

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by David Rittlinger on Jan 24, 2011, 1:39 pm

Is there a requirement for an air flow monitoring station in a vertical air handler for a small resdiential apartment in a dormatory building? Typically these spaces only require around 100 cfm...

Last reply: Vamshi Gooje, Feb 8, 2011, 5:09 pm

Energy Star Space Allocation

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Ed Okon on Feb 3, 2011, 3:02 pm

Good Afternoon
I'm currently composing a plan for LEED EB on an existing manufacturing campus comprised of multiple building types (warehouse, shipping and receiving facility, manufacturing...

Last reply: Jenny Carney, Feb 8, 2011, 2:37 pm

Multiple Drainage Patterns

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Joseph Blanco on Feb 7, 2011, 3:14 pm

Can you tell me how to calculate for multiple draingage sites, i have Three on this particular project. The TC is based on the length and travel and the slope towards the discharge point . Do i...

Last reply: Gregory Hurst, Feb 8, 2011, 2:37 pm

Equipment Purchases

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Curt Pascoe on Feb 8, 2011, 11:03 am

We are implementing a Green Cleaning Policy for an ID credit in NCv2009, which simply requires that you meet this prerequisite (not Credits 3.3 & 3.4). However, despite being NC, this...

Last reply: Curt Pascoe, Feb 8, 2011, 2:08 pm

Elevator cabs

Schools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems
posted by Linda Davisson on Feb 8, 2011, 12:10 pm

Often the finishes in an elevator cab are inert materials/non-emitting such as metal panels for walls and plastic unit lighting for ceilings. In the case of plastic laminate panels, the materials...

Last reply: Josh Jacobs, Feb 8, 2011, 1:51 pm