Log in
Forum
Topic

Rating and adaptation registration/selection

LEED Rating System Selection
posted by Jose Castorena on Jun 27, 2024, 10:40 am

Greetings.I am working on a project for a previously certified LEED community college campus (circa 2010). Our project consists of three buildings one of which is an existing...

Last reply: Andrey Kuznetsov, Aug 30, 2024, 5:32 am

GHG emissions calculations for LEED v4- 2024 Update

NC-v4 EAc2: Optimize Energy Performance
posted by Jacob Stieb on May 8, 2024, 6:20 pm

The 2024 update to LEED v4 splits the points into energy cost (site/source) and...

Last reply: Dat Nguyen, Aug 29, 2024, 10:31 pm

Opt 2 Embodied Carbon/LCA Optimization- Eligible materials in European Region

NC-v4.1 MRc2: Environmental Product Declarations
posted by Kairi Noulik on Apr 11, 2024, 6:44 am

Good day

I am working on projects in Estonia and we are trying to achieve the requirement for Opt 2 of this credit by choosing 5 materials from 3 different manufacturers.

During my...

Last reply: Allen Cornett, Aug 29, 2024, 5:17 pm

GEV Emicode: Low-Emitting Materials credit (v4.1)

NC-v4.1 EQc2: Low-emitting materials
posted by Marcelo Alencar Pereira on Aug 28, 2024, 4:59 pm

Good afternoon everyone,

We are working on a LEED BD+C NC certification project in Brazil and have identified adhesives and...

Last reply: Lauren Richardson, Aug 29, 2024, 8:20 am

Option 2 (prescriptive path) documentation?

NC-v4 EAp2: Minimum Energy Performance
posted by Erica Downs on Aug 19, 2024, 2:36 pm

I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG.  The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:34 pm

Sub-Metering for small service buildings

NC-v4 EAc3: Advanced Energy Metering
posted by Cyle Sheppard on Aug 20, 2024, 3:36 pm

I have a question from our Electrical Engineer that I am unsure on. 

Our building has several small service buildings at the rear of the property. We understand that we need to include...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:31 pm

Plug loads Process Loads savings vs baseline

CI-v4 EAc2: Optimize Energy Performance
posted by Xavier Valladares on Oct 3, 2019, 12:43 pm

Hi All,

Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if

...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:22 pm

Process loads- plug loads

NC-2009 EAc1: Optimize Energy Performance
posted by charles bell on Apr 17, 2013, 2:31 pm

Hello,
Under EAc1 my understanding is that the energy model will use a baseline assumption for plug loads. Would it be possible to introduce a plug load energy reduction program as an ID...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:21 pm

Plug Load Exemption

NC-2009 EAp2: Minimum Energy Performance
posted by Kim Lombard on Apr 23, 2015, 2:07 pm

insight and comments. I very much appreciate this forum as a place where we can ask the questions concerning our project, even when the questions aren't popular ones. Like most projects this one has...

Last reply: Marcus Sheffer, Aug 28, 2024, 3:20 pm

Zone Air Distribution Effectiveness

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Noriko Nagazumi on Mar 2, 2012, 1:45 am

Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue.

Our project utilizes total heat exchangers for ventilation. We wonder what Ez should we use...

Last reply: EST220910BF6 ESTIMPAC SAS DE CV, Aug 28, 2024, 2:40 pm