Log in
Forum
Topic

"LEED Certified" Vehicles

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Jeremy Kuhre on Oct 25, 2010, 12:15 pm

Ok, so we all know that vehicles can't be LEED certified; however, ACEEE offers a very useful spreadsheet for all cars that meet the LEED standard for this credit. You can find it here:

...

Envelope mandatory provisions

CS-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Oct 24, 2010, 7:18 pm

According to Ashrae 90.1-2007 art 5.4.1 where insulation is required in sections 5.5 or 5.6 it shall comply with 5.8.1.1-5.8.1.9. What is not clear to me is if you have to comply with the...

Last reply: javier bolanos zeledon, Oct 25, 2010, 12:07 pm

printer rooms in tenant scope of work

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Victoria Lockhart on Aug 27, 2010, 9:43 am

From the wording in the reference guide, I had understood that the ventilation requirements of printer rooms are not relevant in CS where these are part of the tenant fit-out (CS guidance, page...

Last reply: Victoria Lockhart, Oct 25, 2010, 11:45 am

LEED V3- E-mail Communications and Role Identification Matrix

NC-2009 MRc7: Certified Wood
posted by Keerthi Ratnayake on Oct 22, 2010, 11:55 am

I have two questions.

1. Does LEED accept e-mail communications (to and from client, contractor, design team etc.) as valid documentary proof for various credits?

2. Does LEED has a...

Last reply: Doug Pierce, AIA, Oct 24, 2010, 9:47 pm

Wall on Site Boundary

NC-2009 SSc8: Light Pollution Reduction
posted by Omer Moltay on Oct 23, 2010, 3:01 pm

We have a 2 m. high brick wall running all around out site. This wall belongs to the property so it is within the site boundary and the site boundary runs exactly along the outside surface of the...

adding two G+2 retails buildings to the designed building

NC-2009 EAc1: Optimize Energy Performance
posted by Tarek Dalati on Oct 18, 2010, 4:11 am

we are working on a mixed use tower (80% residential and 20% office)and we applied to...

Last reply: Marcus Sheffer, Oct 22, 2010, 10:02 am

Option 1- Equipment Efficiency

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nancy Henderson on Oct 21, 2010, 6:53 pm

We have a new build out of a small office in an existing industrial building. We will be adding new package roof top units with DX cooling and gas heat to condition the office space. We are...

Last reply: Paul Conrad, Oct 22, 2010, 9:58 am

Performance Period

General forums
posted by Dan Ackerstein on Oct 22, 2010, 9:53 am

Hi Ryan - I'm not sure I understand your question. The performance period is basically defined by the timing of your submittal. If you submit documentation, your PP effectively ends at that time...

Unable to obtain cut sheet

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Simon Sue on Oct 18, 2010, 10:03 pm

we install a low flow device into our blow out fixture and a external testing show the installed device capable to save 20% water once it been installed. we excited about it, and make the...

Last reply: Dan Ackerstein, Oct 22, 2010, 9:38 am

Audit Form for Classroom

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Bina Indelicato on Oct 20, 2010, 12:04 pm

We are preparing a LEED EB certification for a school and need an audit form for classroom areas. Is there one available for free or do we need to purchase the...

Last reply: Allison Beer McKenzie, Oct 22, 2010, 9:06 am