we install a low flow device into our blow out fixture and a external testing show the installed device capable to save 20% water once it been installed. we excited about it, and make the necessary changes into all our water fixture. it been doing good, and we looking forward to have our performance period to start very soon. but then we notice that, the device doesnt come with any cut sheet for us to do the submission, and after a long discussion, we decided to run a 20% testing onto all the fixture.
the question is, can we do the testing during the performance period or we have to complete the testing before the performance period?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Dan Ackerstein
PrincipalAckerstein Sustainability, LLC
LEEDuser Expert
819 thumbs up
October 22, 2010 - 9:38 am
You can absolutely conduct the testing before the performance period. Remember that the performance period can be extended backwards up to two years, so getting this testing done anytime within the 24 months before you submit your application means it is effectively within the performance period.