Log in
Forum
Topic

SLL Credit 3 Reduced Auto Dependence

General forums
posted by Peter Doo on Feb 26, 2011, 9:52 pm

Requirements emphasize "existing" transit service. I assume that new transit service is negotiated as part of the project plan will also count. Please confirm.

Last reply: Daniel Costantino, Sep 8, 2011, 8:57 am

USGBC responses?

General forums
posted by Bill Swanson on Sep 8, 2011, 8:00 am

I saw Chrissy Macken make several comments on August 10th, but I haven't seen anything from USGBC since then. It's been a month, and the comment window is almost closed. Will anyone from USGBC...

Glare control in CS projects

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Adriana Hansen on Jun 10, 2011, 8:30 am

Hello,

We would like to clarify some questions regarding the credit EQc8.1 – Daylighting for buildings pursuing LEED 2009 Core&Shell certification in Brazil.

When it comes to...

Last reply: Eddy Santosa, Sep 8, 2011, 1:12 am

green power for residential hi-rise

NC-2009 EAc6: Green Power
posted by Lorey Flick on Mar 29, 2011, 1:14 pm

How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building. The owner would like to provide...

Last reply: Mathew Loving, Sep 7, 2011, 7:44 pm

Distribution and Vintage of REC's purchased in a Portfolio

NC-2009 EAc6: Green Power
posted by Eric Elizondo on Jul 8, 2011, 11:37 am

Our client is a national banking program that has purchased...

Last reply: Mathew Loving, Sep 7, 2011, 7:41 pm

Another question on a similar

General forums
posted by David Mortensen on Sep 7, 2011, 11:12 am

Another question on a similar note: when documenting the toilets/urinals, is it the bowl (i.e. American Standard) or the flush valve (i.e. Sloan) that requires attention? It seems like the flush...

Last reply: Alexa Stone, Sep 7, 2011, 5:31 pm

Dual Flush and HE1.28 gpf mixture

NC-2009 WEp1: Water Use Reduction
posted by Paul Telford on Aug 31, 2011, 6:11 pm

I have a bit of a dilemma on my hands with the WE calculations. By owner request, we specified dual flush toilets throughout the building. After a preliminary look at the calculations last year,...

Last reply: Karen Blust, Sep 7, 2011, 5:15 pm

Tenant spaces simulation without HVAC

CS-2009 EAc1: Optimize Energy Performance
posted by victor mattos on Jun 29, 2011, 11:05 am

Does anyone knows if the tenant spaces shall be simulated with HVAC system for a shopping mall or can i just simulate with idealloads?
I searched in the LEED Reference guide Appendix 2 but...

Last reply: Erika Duran, Sep 7, 2011, 3:06 pm

LEED Regional Priority Credit Database

General forums
posted by Nathan Lee on Sep 7, 2011, 2:05 am

Question regarding the RPC database lookup. Looking into registering a project located in Seoul and tried entering the local zip code, but getting an invalid zip code error. The strange part is,...

Last reply: Susann Geithner, Sep 7, 2011, 2:27 pm

Seawater flushing

CI-2009 WEc1: Water Use Reduction
posted by Edwin Wealend on Jul 25, 2011, 2:46 am

Hi
Does anyone know if sea water flushing which is non-potable water can contribute towards these credits.

We are working on new LEED-CI project in Hong Kong that uses sea water for...

Last reply: JOHN BURNETT, Sep 7, 2011, 1:45 am