Topic | Recent |
---|---|
AREA CRITERIACS-2009 EAp2: Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on Aug 9, 2011, 6:54 pm
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS. THE CONDITIONED AREA IS 130,000 FT2 WITH 9 LEVELS OF OFFICE... Last reply: Marcus Sheffer, Sep 27, 2011, 10:15 pm |
|
Building Slabs: not in Developer's scope of workCS-2009 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Jul 5, 2011, 2:09 pm
In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-... Last reply: Marcus Sheffer, Sep 27, 2011, 10:12 pm |
|
Energy ModelingCS-2009 EAp2: Minimum Energy Performanceposted by Yolanda Sanchez on Jul 11, 2011, 1:39 pm
In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-... Last reply: Marcus Sheffer, Sep 27, 2011, 10:10 pm |
|
Compliance with Appendix G ASHRAECS-2009 EAp2: Minimum Energy Performanceposted by Daniela Castro Salgado on Aug 10, 2011, 7:04 pm
We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems: 1. The client does not want a water treatment plant. Last reply: Marcus Sheffer, Sep 27, 2011, 10:02 pm |
|
LEED CS- EAp2 Existing equipment to remainCS-2009 EAp2: Minimum Energy Performanceposted by BAOQUY VU on Aug 23, 2011, 9:24 am
I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of... Last reply: Marcus Sheffer, Sep 27, 2011, 9:58 pm |
|
Tenant build-outCS-2009 EAp2: Minimum Energy Performanceposted by Marco ZM on Aug 29, 2011, 6:34 am
We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.... Last reply: Marcus Sheffer, Sep 27, 2011, 9:49 pm |
|
Estimating credit acheivementCS-2009 SSc6.2: Stormwater design - quality controlposted by Amanda Ross on Sep 27, 2011, 7:35 pm
1) Does anyone know of any local/regional programs with the 80% standard in the Vancouver, BC area? Our project is located in Surrey, BC. My civil engineer tells me that he knows of no... |
|
Creme Marfil MarbleCI-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Colleen Ice on Sep 27, 2011, 12:42 pm
I see a lot of threads based on hard surface materials being exempt, but what about marble. I need to find the life cycle data for other credits, but do I need FloorScore information on this... Last reply: Colleen Ice, Sep 27, 2011, 2:13 pm |
|
Expected volume of recyclingCI-2009 MRp1: Storage and Collection of Recyclablesposted by Nina Tallering on Jun 16, 2011, 6:53 pm
How do I calculate the 'expected volume of recycling'? I realize this is a redundant post/question, however, we continue to receive... Last reply: Michelle Rosenberger, Sep 27, 2011, 1:23 pm |
|
Ventiltions Rates Healthcare FacilitiesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Veronika Sundberg on Jun 13, 2011, 3:28 am
Hi, I am working on a hospital project with a vast amount of different space types. Table 6.1 found in the ASHRAE standard lists very few of the “Occupancy Categories” that we have in our... Last reply: Roger Chang, Sep 27, 2011, 11:11 am |