Log in
Forum
Topic

EBOM- Minimum Energy Performance

General forums
posted by Elizabeth Crenshaw Hammitt on Sep 28, 2011, 10:20 am

There is some controversy around the new prerequisite, EA PR 2, but I would like to thank the USGBC for recognizing that the current ENERGY STAR mandate does not further the organization's core...

Last reply: Elizabeth Crenshaw Hammitt , Sep 29, 2011, 10:10 am

# test sites for condo project?

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Norma Lehman on Sep 26, 2011, 8:57 am

Your comment in "Bird's Eye View" above states:
"Buildings with large numbers of identical rooms with separate ventilation zones—such as hotel rooms or apartment units—have been allowed to...

Last reply: Allison Beer McKenzie, Sep 29, 2011, 9:22 am

Evidence Required: sample lease(s) associated with LEED

NC-2009 EAp2: Minimum Energy Performance
posted by Jane Long on Sep 29, 2011, 5:24 am

Hi All,

Could someone please enlighten me as to the relevant of the requirement to “provide the lease(s) or sample lease(s) associated with the LEED project” please?

What leases?!...

Last reply: Gerard Hazel, Sep 29, 2011, 7:45 am

Credit for Natural Ventilation?

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Jan 14, 2010, 7:58 am

It appears that although Natural Ventilation vs. Mechanical will save energy, this is not accounted for in the whole building energy simulation as the baseline building will also have natural...

Last reply: Yong Lee Low, Sep 28, 2011, 11:38 pm

green cleaning in schools

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Lauren Ulmer on Sep 26, 2011, 3:29 pm

What do you do about achieving this Prereq if the school district requires the use of bleach as a disinfectant?

Last reply: Lauren Ulmer, Sep 28, 2011, 9:10 pm

More than one EP per section?

EBOM-2009 IOc1: Innovation in Operations
posted by matthew strong on Sep 28, 2011, 11:42 am

Can you have more than one EP per section.....for example for MR credit 2 AND MR credit 6?

Last reply: Tristan Roberts, Sep 28, 2011, 4:39 pm

airflow limitation of lab spaces during unoccupied periods

CS-2009 EAc1: Optimize Energy Performance
posted by heinrich post on Sep 9, 2011, 10:38 am

According to Ashrae 90.1-2007 G3.1.1.d there should be a fan flow limitation for lab spaces in the baseline model during unoccupied hours.
"For Lab spaces with a minimum of 5000 cfm of...

Last reply: Ante Vulin, Sep 28, 2011, 4:18 pm

Calculating views with casework in the room

NC-2009 IEQc8.2: Daylight and views - views
posted by Renee Shirey on May 24, 2011, 11:24 am

In the example (Mt Healthy school) in the Documentation Toolkit section of this credit, the only thing that seems to limit the views is the window locations and the walls. Why is the casework...

Last reply: Renee Shirey, Sep 28, 2011, 3:16 pm

Random Selection of Survey Pool Members

Doing the Alternative Commuting Transportation Survey
posted by James Green on Sep 23, 2011, 5:39 pm

One building's survey pool size was determined to be ~500 out of ~1500 total occupants. Assume survey forms are to delivered to every third person passing into the elevator vestibules (the only...

Last reply: Dan Ackerstein, Sep 28, 2011, 1:00 pm

Exemplary Performance- forms question

NC-2009 MRc2: Construction Waste Management
posted by André Knutsson on Sep 19, 2011, 8:09 am

We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window...

Last reply: André Knutsson, Sep 28, 2011, 2:40 am