We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window. We have marked for Exemplary Performance in the MRc2 form. Can anyone give me a hint on how to solve this??
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Valerie Walsh
Sustainable Design & Construction ConsultantsWalsh Sustainability Group
219 thumbs up
September 27, 2011 - 5:48 pm
Andre, be sure when you Add/Remove Credits, it is for IDc1.1 for Construction and not the Design IDc1.1. That could be why you are having trouble since MRc2 is a Construction credit. The icon to the left of the ID credit number on the Scorecard page should be the hammer. If you have any empty or unused Design ID creidts but they are assigned credits, it could prevent you from adding the Construction ID credit. Also, be certain that the MRc2 LEED Credit Form confirms that you have achieved greater than 95% in the final calculation.
André Knutsson
Environmental engineer - Mc S. Civile EngineeringYIT Buildings Systems AS
36 thumbs up
September 28, 2011 - 2:40 am
And suddenly there was a point in Innovative in Design. Thanks :)