Log in
Forum
Topic

Bottle filling stations

NC-2009 IDc1: Innovation in Design
posted by Craig Phillips on Nov 29, 2011, 3:22 pm

Is there an ID credit or other credit that can be acheived by providing bottle filling stations in the project? It seems that we could prove the savings of recycling or waste vs....

Last reply: Susan Walter, Nov 29, 2011, 4:57 pm

Can't use LEED 2009 MF sections for an NC 2.2 project.

General forums
posted by Nadav Malin on Sep 23, 2010, 2:42 pm

Hi Christopher,
The rules say that you're NOT allowed to use the LEED 2009 guidelines for which materials to include/exclude in an NC 2.2 project. To be safe you should just include the MF...

Last reply: Tim Crowley, Nov 29, 2011, 1:38 pm

Re: Community development project certification

General forums
posted by David Posada on Nov 29, 2011, 1:21 pm

You might try posting your question at the forum topic for LEED-ND projects:
http://www.leeduser.com/...

Last reply: David Posada, Nov 29, 2011, 1:30 pm

Owner Agent required information

NC-2009 EAc2: On-Site Renewable Energy
posted by Francisco Villela on Nov 29, 2011, 10:54 am

Marcus,
I am looking at the on-line form for EAc2 On-Site Renewable Energy. (LEED 2009 for New Construction) The asterisk occurs after each of two Required Signatory boxes. Path selected...

Last reply: Marcus Sheffer, Nov 29, 2011, 11:56 am

Sealants and gaskets

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by ruffina thilakaratne on Nov 29, 2011, 1:49 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up November 29, 2011- 10:30 am Ruffina, this credit covers things that are applied on site—usually wet-applied. So gaskets would not be covered, and usually glazing is made off-site. Sealants are covered under IEQc4.1, so please post your questions about those under that forum. Log in or register to post comments ...

Last reply: Tristan Roberts, Nov 29, 2011, 10:30 am

Commissioning innovation point

CS-2009 EAc3: Enhanced Commissioning
posted by Magnus Stagnäs on Nov 29, 2011, 2:26 am

The reference guide states that CS projects requiring both fundamental and enhanced...

Last reply: Chris Ladner, Nov 29, 2011, 8:40 am

Interpretation doubt

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Carolina Vergnano on Nov 29, 2011, 5:55 am

Hello,
I've got a doubt about the time that we should develop the breakdown of energy.
The guide says: "This analysis of major energy-use categories must have been conducted within 2...

Last reply: Christopher Schaffner, Nov 29, 2011, 6:40 am

Exterior Lighting- LPD

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Simon Sue on Nov 23, 2011, 3:48 am

We have a retail banking project. the building is 2 stories high + a roof top and was renovated. We installed a roof garden on it. we also install light fixture surrounding the roof garden....

Last reply: Glenn Heinmiller, Nov 28, 2011, 9:43 pm

Definition of hard-lid ceiling?

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Renee Shirey on Nov 28, 2011, 5:30 pm

I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses). To enclose the room, I...

Last reply: Allison Beer McKenzie, Nov 28, 2011, 6:43 pm

Applying steel primer

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Michael Esposito on Jan 21, 2011, 8:13 pm

I have a steel fabricator applying a primer (grey) to the bar joists and steel for my project at thier facility. Do they still need to comply with the...

Last reply: Roberto Meza, Nov 28, 2011, 6:02 pm