Documentation ToolkitEBOM-2009 MRp1: Sustainable Purchasing Policyposted by Robin Obaugh on Oct 18, 2010, 7:01 pm
Silly question I know, but when utilizing the "template" for the Sustainable Purchasing Policy, should we delete the header and footers related to LEED User? Last reply: Robin Obaugh, Oct 19, 2010, 11:56 am |
|
Modeling DX systems with set cfm/ton constraintsNC-2009 EAc1: Optimize Energy Performanceposted by Barbara McCrary on Oct 18, 2010, 1:48 pm
I was wondering if anyone had experience modeling DX systems in their proposed systems. I received a USGBC comment that the actual airflow had to be modeled, auto-sizing was not allowed. My... Last reply: Michael Tillou, Oct 19, 2010, 11:49 am |
|
Ineligible intersectionsPilot-Credits PC9: Street Networkposted by Michael Miller on Oct 19, 2010, 11:36 am
I would suggest that intersections that only serve on-/off-ramps for controlled-access highways also be excluded from being counted for this credit. |
|
EQc6.1 for multi-occupant spacesCI-2009 IEQc6.1: Controllability of systems - lightingposted by Michele Helou on Oct 4, 2010, 12:55 pm
Does anyone know if multi-occupant spaces such as exhibit spaces or lecture rooms without... Last reply: Danuta Drozdowicz, Oct 18, 2010, 9:30 pm |
|
LEED OnlineEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Paul C on Sep 20, 2010, 10:29 am
I want to make sure I am understanding this correctly in filling out LEED Online, I am a little confused when filling out LEED Online: -I have an multi-tenant office building so everyone... Last reply: Dan Ackerstein, Oct 18, 2010, 6:42 pm |
|
Performance Period MeteringEBOM-2009 WEc3: Water Efficient Landscapingposted by Matthew Macko on Oct 5, 2010, 1:56 pm
I have a project that has recently had an irrigation metered installed, but unfortunately it happened after July. The project is running from October to January and cannot be extended through... Last reply: Dan Ackerstein, Oct 18, 2010, 6:32 pm |
|
Hot and humid areaCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Oct 15, 2010, 12:03 am
I have a CS V2.0 office building project in a hot an humid area, climate zone 3C as per Ashrae. Last reply: javier bolanos zeledon, Oct 18, 2010, 11:15 am |
|
questions about LEED reviewer comments at EAp2NC-2009 EAp2: Minimum Energy Performanceposted by Florian Schmidtchen on Sep 27, 2010, 12:21 am
hello folks, I just received the comments from the reviewer and have some questions about them. The reviewer questioned a lot about the fan power simulation. Q1. AppendixG assumes... Last reply: Christopher Schaffner, Oct 16, 2010, 1:58 pm |
|
Modeling targets and after M&VNC-2009 EAc1: Optimize Energy Performanceposted by Ned Halling on Oct 12, 2010, 12:50 pm
We would like our proposed model to meet a minimum of 30% increased energy performance. After modeling, the potential increase is 44%. Is it possible to submit the credit showing a 30% increase... Last reply: Marcus Sheffer, Oct 16, 2010, 10:04 am |
|
Is Acacia tress a rapid renewable material?CI-2009 MRc6: Rapidly Renewable Materialsposted by Simon Sue on Oct 15, 2010, 6:39 am
i get to know from my supplier that their product was made from Acacia trees and it will growth to maturity below 10 years. i try to check on USGBC or EPA list of renewable resouces material and... Last reply: Simon Sue, Oct 15, 2010, 11:31 pm |