Topic | Recent |
---|---|
LEED for Schools 2007 version WEc3 Exemplary PerformanceSchools-2009 WEc3: Water Use Reductionposted by Glen Boldt on Jun 16, 2011, 7:42 pm
We are working on a LEED for Schools (v 2007 -- again, listed here because there's no v2 Schools section) that just had an exemplary performance strategy denied for achieving >40% reduction.... Last reply: Tristan Roberts, Jun 17, 2011, 2:29 pm |
|
ASHRAE 90.1 vs Local Energy CodeNC-2009 EAp2: Minimum Energy Performanceposted by Todd LaFreniere on Jun 17, 2011, 11:06 am
If the local energy code is more stringent with respect to building U-factors does the baseline model need to meet the local energy code? Last reply: Todd LaFreniere, Jun 17, 2011, 11:16 am |
|
How much flexibilty do you have with what gets sub-metered?NC-2009 EAc5: Measurement and Verificationposted by R. Ted Krasnesky on Jun 16, 2011, 3:46 pm
Say you have a fairly complex project, but the facility engineers only want to sub-meter 7 electrical systems for measurement and verification. The rest of the energy will be monitored through... Last reply: David Eldridge, Jun 16, 2011, 6:13 pm |
|
YES!!General forumsposted by April Ambrose on Jun 16, 2011, 2:59 pm
Yes. We are seeing the same situation. On the one hand it helps make our job as LEED Project Managers seem increasingly valuable since it's our job to ensure we meet the requirements of all the... |
|
Credit Closing in JulyPilot-Credits PC20: Recycled Contentposted by Batya Metalitz on Jun 2, 2011, 11:21 am
This credit will be closing in July 2011, with the launch of the LEED 2012 2nd Public Comment period. The credit will be replaced with a new materials related credit that will be added to the... Last reply: Batya Metalitz, Jun 16, 2011, 1:38 pm |
|
Urban Building: Does Not Own SidewalkEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Kevin Kelly on Oct 22, 2010, 9:54 am
I have a 1,000,000 SF building in NYC that does not own sidewalk that surrounds the building on one of the four sides. This side has a rear entrance. How can the building enforce a no smoking... Last reply: Kimberly Cullinane, Jun 16, 2011, 12:41 pm |
|
Calculating Use of UrinalsNC-2009 WEp1: Water Use Reductionposted by Dave Wortman on Jun 13, 2011, 6:17 pm
We are completing documentation on a LEED-NC project and are trying to come up with a sound methodology for calculating use of the building's lavatories. Specifically, Floors 1 and 2 of the... Last reply: Tristan Roberts, Jun 15, 2011, 3:47 pm |
|
Bio-Based Materials CreditNC-2009 IDc1: Innovation in Designposted by Robert Phinney on Jun 15, 2011, 1:37 pmthis question to the MRc6 forum. Log in or register to post comments ... Last reply: Tristan Roberts, Jun 15, 2011, 3:14 pm |
|
Supplemental Daylight / Views Calculation Spreadsheet ERRORNC-2009 IEQc8.1: Daylight and views - daylightposted by Lindsay Duncan on Jun 14, 2011, 6:33 pm
I downloaded the spreadsheet from LEED online today and have encountered problems. I've been able to input data but I'm not able to add rows to the spreadsheet. The instructions say to click on "... Last reply: Lindsay Duncan, Jun 15, 2011, 11:28 am |
|
PI f3: Full-Time Equivalence and Total Daily OccupancyGeneral forumsposted by Daniela Aguilera on Jun 14, 2011, 10:46 pm
I'm working on a core and shell certification proyect, especifically filling out the PI form -3, i don't know which option i need to select in order to achieve this prerequisite because, first of... Last reply: Winnie Ma, Jun 15, 2011, 2:27 am |