Topic | Recent |
---|---|
Simple simulation questionNC-2009 EAp2: Minimum Energy Performanceposted by Timo Marquez on Jul 26, 2011, 8:05 pm
This might be a rather simple question, but would like avoid confusion. Apendix G indicates for vertical fenestration "40% of gross above-grade wall area, or smaller, shall be distributed... Last reply: Marcus Sheffer, Sep 19, 2011, 12:35 pm |
|
Industrial Process EnergyNC-2009 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Jul 20, 2011, 7:47 pm
Hi, I am currently working in the certification of an industrial building. The industrial processes are consuming a high percentage of the building's energy consumption. Does the 10% minimum... Last reply: Marcus Sheffer, Sep 19, 2011, 12:24 pm |
|
SHGC of a double skin curtain wallNC-2009 EAp2: Minimum Energy Performanceposted by Chaan Ah Bahk on Jul 19, 2011, 4:05 am
Hi All, Last reply: Marcus Sheffer, Sep 19, 2011, 12:23 pm |
|
Residential apartments Lighting Power DensityNC-2009 EAp2: Minimum Energy Performanceposted by Sustainability Provider on Jun 21, 2011, 5:17 am
Dear All, Last reply: Marcus Sheffer, Sep 19, 2011, 12:16 pm |
|
Exterior Lighting Power AllowancesNC-2009 EAp2: Minimum Energy Performanceposted by Omer Moltay on Jun 15, 2011, 9:41 am
We are struggling with some definitions from Table 9.4.5 of 90.1-2007. If our building has exterior landscaping, is that covered by any of the area types under Tradable Surfaces (for example... Last reply: Marcus Sheffer, Sep 19, 2011, 12:12 pm |
|
Manufacturing Plant Addition- Option 3NC-2009 EAp2: Minimum Energy Performanceposted by Aaron Wascher on Jun 6, 2011, 4:44 pm
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum. The owner... Last reply: Marcus Sheffer, Sep 19, 2011, 12:10 pm |
|
Building occupied intermittently and use of Motion SensorsNC-2009 EAp2: Minimum Energy Performanceposted by Brooks Critchfield on May 31, 2011, 5:19 pm
We have a 3,000 SF building which will be occupied intermittently by the client/owner. One small part of the building is being continuously maintained at occupied temperatures, a second... Last reply: Marcus Sheffer, Sep 19, 2011, 12:08 pm |
|
Construction Details in Baseline ModelNC-2009 EAp2: Minimum Energy Performanceposted by Xing Shi on May 31, 2011, 11:51 am
In ASHRAE90.1-2007, the construction type and U value of Baseline Model is regulated. We use EnergyPlus to do energy modeling, so there is a problem, where can we find standard construction... Last reply: Marcus Sheffer, Sep 19, 2011, 12:06 pm |
|
case 2. Residential and Hospital Projects Only- RequirementsNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Veronika Sundberg on Jun 14, 2011, 5:29 am
Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met. The four first ones are... Last reply: Veronika Sundberg, Sep 19, 2011, 5:12 am |
|
Warehouse ClassificationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Prudence Ferreira on Jul 21, 2011, 3:55 pm
We are trying to classify a winery. One of the areas is used for barrel fermentation, and is temperature controlled anywhere from 55-75 degrees based on the fermentation process. Would this... Last reply: Jenny Carney, Sep 16, 2011, 3:33 pm |