OPTION 3- Survey TimeEBOM-2009 SSc4: Alternative Commuting Transportationposted by WAGNER OLIVEIRA SILVA on Nov 30, 2011, 2:57 pm
We have same dubs about survey time. The LEED EB: O&M 2009 Reference guide inform that the survey must be conduct either (1) each day over 5 consecutive workdays or (2) at the conclusion of 5... Last reply: Tristan Roberts, Dec 16, 2011, 10:17 pm |
|
Measuring device for system running at constant speed and rate?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Mona Eigbrett on Mar 9, 2010, 10:01 am
I work with a mechanical engineer who asked the following: "If I have a dedicated outside air system in which the fan runs at a constant speed and volumetric rate, do I still need to provide an... Last reply: Sonrisa Lucero, Dec 16, 2011, 6:08 pm |
|
Indoor vegetation.CS-2009 SSc5.1: Site development - protect or restore habitatposted by Gabriela Hernández Castillo on Dec 21, 2010, 1:10 am
Can indoor vegetation be counted as green area so we can comply with SSC5.1 under the RESTORE path? How would you define something that "promotes" biodiversity? Thank you. Last reply: Gabriela Hernández Castillo, Dec 16, 2011, 4:09 pm |
|
Controls for open-floor planCI-2009 IEQc6.1: Controllability of systems - lightingposted by Diana Nezamutinova on Dec 6, 2011, 6:33 am
Our project is following CI-2009 guidelines. What lighting controls would be sufficient for offices with open floor plans? Could a "cluster" (an "island") of 6 tables linked together be... Last reply: Lauren Sparandara, Dec 16, 2011, 2:37 pm |
|
Flooring UnderlaymentsNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Michele Helou on Dec 15, 2011, 12:20 pm
Does anyone know if sound control underlayments (homosote or cork) need to also be FloorScore rated for this credit? Technically, it's part of the flooring system and we are trying for MRc6 but... Last reply: Lauren Sparandara, Dec 16, 2011, 1:41 pm |
|
SMaRT Sustainable Products StandardNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Brynn Horley on Dec 13, 2011, 3:54 pm
has anyone heard of this standard? I've received a floor product which claims to be certified by this standard. Last reply: Melissa Vernon, Dec 16, 2011, 11:14 am |
|
Basic Services of a College CampusCI-2009 SSc2: Development Density and Community Connectivityposted by Timothy Fry on Oct 26, 2010, 6:12 pm
The project I am working on is part of a University and is on the outskirts of the main campus of where I could get my 10 basic services no problem what so ever, would any of the college campus... Last reply: Sue Barnett, Dec 16, 2011, 10:52 am |
|
Benefits of LEED NC or CSLEED Rating System Selectionposted by Nathan Lee on Dec 11, 2011, 8:50 pm
I am working on a mixed-use project which includes, office space, hotel, and some retail. We are in the process of choosing LEED CS or NC and are leaning towards CS because at this point the... Last reply: Tristan Roberts, Dec 16, 2011, 9:58 am |
|
entryway systems for hospitalsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Dario Ibarguengoitia on Dec 15, 2011, 6:13 pmSusan Walter HDR LEEDuser Expert 1296 thumbs up December 16, 2011- 8:11 am Dario, We do have conversations regarding this earlier and in the v2.2 forum. The entryway systems are best if used with a floor drain. I think roll out mats are a viable option if they can be combined with the same Schools requirement for self-maintained mats. Log in or register to post comments ... Last reply: Susan Walter, Dec 16, 2011, 8:11 am |
|
ESC control: flat land, low water mantle and no drainage sewerNC-2009 SSp1: Construction Activity Pollution Preventionposted by marisol cano on Nov 1, 2010, 8:13 pm
Hello. Last reply: Steve Loppnow, Dec 15, 2011, 7:23 pm |